Combination of dispatching rules and prediction for solving multi-objective scheduling problems

被引:4
作者
Dang, T. Tung [1 ]
机构
[1] Univ Limerick, Enterprise Res Ctr, Limerick, Ireland
关键词
dispatching rules; heuristics; scheduling; JOB-SHOP; ALGORITHMS; SIMULATION;
D O I
10.1080/00207543.2013.793857
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Multi-objective scheduling problems are generally difficult to solve in a limited amount of time. Using dispatching rules is able to find solutions for a relatively acceptable amount of time, but with quality far from the optimal one. The method presented in this paper is based on the same principle as other dispatching rule methods, but improved by combining the method with predicted data. Predicted information of a future schedule provides better overview of the current state of the solving problem, possible impacts of each decision, and consequently leads to better performance of classical dispatching rules. Calculation of predicted data on the other hand requires only a fraction of time, as a result of quadratic complexity of the method for prediction. The proposed method is implemented and deployed in several make-to-order manufacturing sites.
引用
收藏
页码:5180 / 5194
页数:15
相关论文
共 25 条
[1]  
[Anonymous], 2010, Int. J. Eng. Sci. Technol, DOI DOI 10.4314/IJEST.V2I1.59105
[2]   A simulation study of new multi-objective composite dispatching rules, CONWIP, and push lot release in semiconductor fabrication [J].
Bahaji, N. ;
Kuhl, M. E. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (14) :3801-3824
[3]  
Bretscher O., 2005, LINEAR ALGEBRA APPL
[4]   A new paradigm for rule-based scheduling in the wafer probe centre [J].
Chiang, T. C. ;
Shen, Y. S. ;
Fu, L. C. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (15) :4111-4133
[5]   Using dispatching rules for job shop scheduling with due date-based objectives [J].
Chiang, Tsung-Che ;
Fu, Li-Chen .
2006 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION (ICRA), VOLS 1-10, 2006, :1426-+
[6]   Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times [J].
Chiang, Tsung-Che ;
Fu, Li-Chen .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 196 (01) :78-92
[7]   The particle swarm - Explosion, stability, and convergence in a multidimensional complex space [J].
Clerc, M ;
Kennedy, J .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (01) :58-73
[8]   Multiple response optimization using mixture-designed experiments and desirability functions in semiconductor scheduling [J].
Dabbas, RM ;
Fowler, JW ;
Rollier, DA ;
McCarville, D .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (05) :939-961
[9]  
HAUPT R, 1989, OR SPEKTRUM, V11, P3
[10]   A simulation study of dispatch rules for reducing flow times in semiconductor wafer fabrication [J].
Hung, YF ;
Chen, IR .
PRODUCTION PLANNING & CONTROL, 1998, 9 (07) :714-722