Settlements of HSL immersed tunnels

被引:0
作者
Mortier, H. [1 ]
Hakkaart, Ch. J. A. [2 ]
Hart, W. M. 't [3 ]
机构
[1] CFE Beton & Waterbouw, Dordrecht, Netherlands
[2] BAM Delta Marine Consultants, Gouda, Netherlands
[3] Ballast Nedam Infra, Nieuwegein, Netherlands
来源
GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND | 2006年
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper explains the prediction of the settlements of the two immersed tunnels in the Dutch High Speed railway Line (HSL) between Amsterdam and the Belgian border, designed and built by Drechtse Steden, and the relation between predicted values and measured settlements. Also the use of survey data in order to predict long term settlement behavior will be explained.
引用
收藏
页码:259 / +
页数:2
相关论文
empty
未找到相关数据