EFFECTS IN SERVICE OF THE STAGGERED CONSTRUCTION OF CABLE-STAYED BRIDGES BUILT ON TEMPORARY SUPPORTS

被引:6
作者
Lozano-Galant, Jose Antonio [1 ]
Paya-Zaforteza, Ignacio [2 ]
Turmo, Jose [3 ]
机构
[1] Univ Castilla La Mancha, Dept Civil Engn, E-13071 Ciudad Real, Spain
[2] Univ Politecn Valencia, Dept Contruct Engn, ICITECH, Valencia 46023, Spain
[3] Univ Politecn Cataluna, Dept Contruct Engn, BarcelonaTech, ES-08034 Barcelona, Spain
来源
BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING | 2015年 / 10卷 / 03期
关键词
cable-stayed bridge; temporary supports; construction joint; optimization; objective service stage; SIMULATION; SHRINKAGE; ALGORITHM; CREEP;
D O I
10.3846/bjrbe.2015.31
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cable-stayed bridges can be rarely built on a single construction stage and staggered construction is commonly used. The effects of this staggered construction are not only economical as they might also play an important role in the structural behaviour in service. Despite of this importance, these effects are rarely included into the definition of the structural response in service. In order to fill this gap, this paper deals with the effects in service of the staggered erection of steel cable-stayed bridges built on temporary supports. To do so, a criterion based on the minimization of the bending energy in terms of stay forces is applied to several cable-stayed bridges. This study shows the importance of the existence of the pylon-deck connection as well as the number and location of both construction joints and temporary supports during staggered erection.
引用
收藏
页码:247 / 254
页数:8
相关论文
共 14 条
[1]  
Akesson B., 2008, UNDERSTANDING BRIDGE
[2]   MODIFICATIONS OF THE STRESS-STATE OF CABLE-STAYED BRIDGES DUE TO STAGGERED CONSTRUCTION OF THEIR SUPERSTRUCTURE [J].
Antonio Lozano-Galant, Jose ;
Ruiz-Ripoll, Lidia ;
Paya-Zaforteza, Ignacio ;
Turmo, Jose .
BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING, 2014, 9 (04) :241-250
[3]   Creep and shrinkage effects in service stresses of concrete cable-stayed bridges [J].
Antonio Lozano-Galant, Jose ;
Turmo, Jose .
COMPUTERS AND CONCRETE, 2014, 13 (04) :483-499
[4]   Analysis of concrete cable-stayed bridges for creep, shrinkage and relaxation effects [J].
Cluley, NC ;
Shepherd, R .
COMPUTERS & STRUCTURES, 1996, 58 (02) :337-350
[5]   Optimization of Cable Tensioning in Cable-Stayed Bridges [J].
Janjic, D. ;
Pircher, M. ;
Pircher, H. .
JOURNAL OF BRIDGE ENGINEERING, 2003, 8 (03) :131-137
[6]  
Lazar BE, 1972, J STRUCT DIV ASCE, P1725
[7]   Improved Longitudinal Joint Details in Decked Bulb Tees for Accelerated Bridge Construction: Fatigue Evaluation [J].
Li, Lungui ;
John, Zhongguo ;
Oesterle, Ralph G. .
JOURNAL OF BRIDGE ENGINEERING, 2010, 15 (05) :511-522
[8]   An algorithm for simulation of concrete cable-stayed bridges built on temporary supports and considering time dependent effects [J].
Lozano-Galant, J. A. ;
Turmo, J. .
ENGINEERING STRUCTURES, 2014, 79 :341-353
[9]   Forward Algorithm for the construction control of cable-stayed bridges built on temporary supports [J].
Lozano-Galant, J. A. ;
Paya-Zaforteza, I. ;
Xu, D. ;
Turmo, J. .
ENGINEERING STRUCTURES, 2012, 40 :119-130
[10]   Analysis of the construction process of cable-stayed bridges built on temporary supports [J].
Lozano-Galant, J. A. ;
Paya-Zaforteza, I. ;
Xu, D. ;
Turmo, J. .
ENGINEERING STRUCTURES, 2012, 40 :95-106