A day-ahead Optimal Scheduling Operation of Battery Energy Storage with Constraints in Hybrid Power System

被引:7
作者
Paliwal, Navin K. [1 ]
机构
[1] MNNIT Allahabad, Prayagraj 211004, India
来源
INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND DATA SCIENCE | 2020年 / 167卷
关键词
artificial bee colony; battery energy storage; hybrid power system; optimal scheduling; renewable energy sources; ECONOMIC-DISPATCH; OPTIMIZATION;
D O I
10.1016/j.procs.2020.03.263
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In present situation, the renewable energy sources (RES) are turned into significant part of power system. Such power system is generally acknowledged as the hybrid power system (HPS), which is accountable for meeting its connected load. Battery energy storage (BES) is essentially needed along with RES to deal their intermittency and to commit them as dispatchable sources at some extent. An effective optimal scheduling operation of BES in such systems is a tedious assignment, due to unpredictable nature of RES, load, and electricity tariff. In this paper, a HPS integrated with utility grid (UG) containing wind farm (WF), solar photovoltaic (SPV), BES, and connected load is taken for problem simulation. The main aim of this paper is a day-ahead optimal scheduling of BES with its operational limitations in a HPS. To improve the BES performance, BES scheduling operation is mainly constrained by quick switching cost, energy conversions loss cost along with its state of health condition and charging/ discharging rate (fast or slow) restrictions. Optimization is executed through artificial bee colony algorithm (ABC) and the results are compared or validated using the classical technique, i.e., interior point method (IPM) of MATLAB fmincon function. (C) 2020 The Authors. Published by Elsevier B.V.
引用
收藏
页码:2140 / 2152
页数:13
相关论文
共 21 条
[1]  
Anvari-Moghaddam A, 2015, 2015 IEEE FIRST INTERNATIONAL CONFERENCE ON DC MICROGRIDS (ICDCM), P57, DOI 10.1109/ICDCM.2015.7152010
[2]   Energy Management for Lifetime Extension of Energy Storage System in Micro-Grid Applications [J].
Duong Tran ;
Khambadkone, Ashwin M. .
IEEE TRANSACTIONS ON SMART GRID, 2013, 4 (03) :1289-1296
[3]   Optimal operation of energy storage devices with RESs to improve efficiency of distribution grids; technical and economical assessment [J].
Farrokhifar, M. .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2016, 74 :153-161
[4]  
García F, 2013, IEEE IND ELEC, P7932, DOI 10.1109/IECON.2013.6700458
[5]   A robust optimization based approach for microgrid operation in deregulated environment [J].
Gupta, R. A. ;
Gupta, Nand Kishor .
ENERGY CONVERSION AND MANAGEMENT, 2015, 93 :121-131
[6]  
Javadi MS, 2017, 2017 1ST IEEE INTERNATIONAL CONFERENCE ON ENVIRONMENT AND ELECTRICAL ENGINEERING AND 2017 17TH IEEE INDUSTRIAL AND COMMERCIAL POWER SYSTEMS EUROPE (EEEIC / I&CPS EUROPE)
[7]   On the performance of artificial bee colony (ABC) algorithm [J].
Karaboga, D. ;
Basturk, B. .
Applied Soft Computing Journal, 2008, 8 (01) :687-697
[8]   Optimisation of voltage and frequency regulation in an isolated wind-driven six-phase self-excited induction generator [J].
Kumar, A. Senthil ;
Munda, Josiah L. .
JOURNAL OF THE ENERGY INSTITUTE, 2014, 87 (03) :235-245
[9]  
Lasseter R., 2003, TECH REP
[10]  
Lasseter RH, 2002, 2002 IEEE POWER ENGINEERING SOCIETY WINTER MEETING, VOLS 1 AND 2, CONFERENCE PROCEEDINGS, P305, DOI 10.1109/PESW.2002.985003