Optimal Financial Means and Profit Distribution between Public and Private Partners in PPP Project Realization

被引:0
作者
Sokolitsyn, Alexander Sergeevich [1 ]
Tvanov, Maxim Vladimirovich [1 ]
Sokolitsyna, Natalya Alexandrovna [2 ]
机构
[1] Peter Grate St Petersburg Polytech Univ, Dept Finance, Ind Management Econ & Trade Inst, St Petersburg, Russia
[2] Peter Grate St Petersburg Polytech Univ, Ind Management Econ & Trade Inst, St Petersburg, Russia
来源
VISION 2020: INNOVATION MANAGEMENT, DEVELOPMENT SUSTAINABILITY, AND COMPETITIVE ECONOMIC GROWTH, 2016, VOLS I - VII | 2016年
关键词
Public-private partnership; public and private partner; distribution; dynamical approach;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
The work sets and solves task of optimizing finance distribution between public and private partners in PPP-project realization with forming centralized foundation by both private and public partners. Centralized foundation financial resources can be used in several development destinations, providing several end figures and having several effectiveness figures. Therefore PPP-project participants have a problem of optimal distribution variant for foundation financial resources and got profit. It need elaborating some possible PPP-project realization variants and, for each participant, defining dependence between used investments and potential profit increase, defined as nonlinear function. At result, such formulated task is nonlinear programming task, which solution can be got with dynamic programming. There are elaborated redistribution procedures of optimal profit, got with system effect, between PPP-project realization participants taking into account their financial resources volumes and their effectiveness definition. These procedures take into account possibility of setting payments from participants for financial resources and these payments absence. There are shown practice results of optimal profit distribution and effectiveness calculation both not taking into account payments for given resources and taking them into account, i.e. forms PPP-projects realization effectiveness increase mechanism.
引用
收藏
页码:2122 / 2129
页数:8
相关论文
共 24 条
  • [1] Regulating concessions of toll motorways: An empirical study on fixed vs. variable term contracts
    Albalate, Daniel
    Bel, Germa
    [J]. TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2009, 43 (02) : 219 - 229
  • [2] [Anonymous], INT J EC FINAN
  • [3] Risk-Neutral Pricing Approach for Evaluating BOT Highway Projects with Government Minimum Revenue Guarantee Options
    Ashuri, B.
    Kashani, H.
    Molenaar, K. R.
    Lee, S.
    Lu, J.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (04) : 545 - 557
  • [4] Behrendt K., 2016, J AGR SYSTEMS, P13, DOI [10.1016/j.agsy.2016.03.001, DOI 10.1016/J.AGSY.2016.03.001]
  • [5] Bellman R., 1965, DYNAMICAL PROGRAMMIN
  • [6] Button K., 2016, J TRANSPORTATION PLA, V39, P131, DOI [10.1080/03081060.2015.1127538, DOI 10.1080/03081060.2015.1127538]
  • [7] The Dark and Bright Sides of Renegotiation: An Application to Transport Concession Contracts
    de Brux, Julie
    [J]. UTILITIES POLICY, 2010, 18 (02) : 77 - 85
  • [8] Multilevel Optimization Modeling for Risk-Averse Stochastic Programming
    Eckstein, Jonathan
    Eskandani, Deniz
    Fan, Jingnan
    [J]. INFORMS JOURNAL ON COMPUTING, 2016, 28 (01) : 112 - 128
  • [9] Gluhov V. V., 2014, GOVT BUSINESS PARTNE
  • [10] Guasch J. L., 2007, INT J IND ORGAN, V26, P421, DOI [10.1016/j.iijindorg.2007.05.003, DOI 10.1016/J.IIJINDORG.2007.05.003]