Stochastic maintenance opportunity windows for unreliable two-machine one-buffer system

被引:11
作者
Lee, Seungchul [1 ]
Gu, Xi [1 ]
Ni, Jun [1 ]
机构
[1] Univ Michigan, Ann Arbor, MI 48105 USA
基金
美国国家科学基金会;
关键词
Stochastic maintenance opportunity windows; Unreliable system; Bernoulli model; Continuous time Markov chain; LINES;
D O I
10.1016/j.eswa.2013.03.049
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The current maintenance practice at most manufacturing plants is to conduct maintenance tasks during non-production shifts, breaks, or weekends, which may unnecessarily introduce extra labor and overhead costs. In order to reduce such costs and make more efficient use of maintenance resources, it is important to look for hidden maintenance opportunities to perform short-duration maintenance tasks, while not bringing any short-term production losses. In this paper, we establish analytical approaches to compute stochastic maintenance opportunity windows (MOWs) for the unreliable two-machine one-buffer system with both discrete time and continuous time Markov models. Instead of allowing buffers to be empty as previous MOW models were constructed, we focus on computing a lower bound in a buffer to reserve buffer space for unexpected random failures during recovery phases. Furthermore, general trends of these lower bounds and their corresponding stochastic MOW values have been investigated through numerical case studies with various system parameter changes. (c) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:5385 / 5394
页数:10
相关论文
共 10 条
[1]   Maintenance opportunity planning system [J].
Chang, Qing ;
Ni, Jun ;
Bandyopadhyay, Pulak ;
Biller, Stephan ;
Xiao, Guoxian .
JOURNAL OF MANUFACTURING SCIENCE AND ENGINEERING-TRANSACTIONS OF THE ASME, 2007, 129 (03) :661-668
[2]   ANALYSIS OF TRANSFER LINES CONSISTING OF 2 UNRELIABLE MACHINES WITH RANDOM PROCESSING TIMES AND FINITE STORAGE BUFFERS [J].
GERSHWIN, SB ;
BERMAN, O .
AIIE TRANSACTIONS, 1981, 13 (01) :2-11
[3]   Hidden maintenance opportunities in discrete and complex production lines [J].
Gu, Xi ;
Lee, Seungchul ;
Liang, Xinran ;
Garcellano, Mark ;
Diederichs, Mark ;
Ni, Jun .
EXPERT SYSTEMS WITH APPLICATIONS, 2013, 40 (11) :4353-4361
[4]   THE ANALYSIS OF AN UNRELIABLE 2-MACHINE PRODUCTION LINE WITH RANDOM PROCESSING TIMES [J].
HONG, YS ;
SEONG, D .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 68 (02) :228-235
[5]   Discovery of hidden maintenance opportunities in automotive assembly lines: MOW and GMOW [J].
Lee, Seungchul ;
Gu, Xi ;
Garcellano, Mark ;
Diederichs, Mark ;
Ni, Jun .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (9-12) :2611-2623
[6]  
Li J., 2008, PRODUCTION SYSTEM EN
[7]  
Liang X., 2012, P ASME 2012 INT MAN
[8]  
Liu J, 2010, ASME J MANUF SCI ENG, V132
[9]   Transient behavior of serial production lines with Bernoulli machines [J].
Meerkov, Semyon M. ;
Zhang, Liang .
IIE TRANSACTIONS, 2008, 40 (03) :297-312
[10]   Dynamic maintenance decision-making for series-parallel manufacturing system based on MAM-MTW methodology [J].
Xia, Tangbin ;
Xi, Lifeng ;
Zhou, Xiaojun ;
Lee, Jay .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 221 (01) :231-240