Analysis of a repairable k-out-of-n:G system with repairman's multiple delayed vacations

被引:2
|
作者
Wu, Wenqing [1 ,2 ]
Tang, Yinghui [2 ]
Yu, Miaomiao [3 ]
Jiang, Ying [1 ]
机构
[1] Southwest Univ Sci & Technol, Sch Sci, Mianyang 621000, Peoples R China
[2] Sichuan Normal Univ, Sch Math & Software Sci, Chengdu 610068, Peoples R China
[3] Sichuan Univ Sci & Engn, Sch Sci, Zigong 643000, Peoples R China
基金
中国国家自然科学基金;
关键词
k-out-of-n:G system; multiple delayed vacations; changeover time; supplementary variable method; reliability measures; RELIABILITY-ANALYSIS; LIMITED SPARES; AVAILABILITY; CAPACITY;
D O I
10.1080/00207160.2015.1085975
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
This paper considers a repairable k-out-of-n:G system with repairman's multiple delayed vacations where the operating times and the repair times of components are governed by exponential distributions and general distributions, respectively. After completion of repair of all broken components, the repairman remains idle for a period of time called changeover time, and then takes a vacation following an arbitrary distribution if there is no operating component breaks down during the changeover time. Applying the supplementary variable method, several reliability measures of the system including the steady-state availability, the steady-state rate of occurrence of failures and the mean time to the first failure are obtained. Meanwhile, some numerical illustrations are presented to demonstrate how the various parameters influence the behaviour of the system. Finally, a special case (n-1)-out-of-n:G system is discussed to validate the correctness of the theoretical results.
引用
收藏
页码:2141 / 2161
页数:21
相关论文
共 50 条
  • [1] Reliability modeling of k-out-of-n system with one repairman having variant vacations
    Yin D.
    Wu J.
    Huang X.
    Guofang Keji Daxue Xuebao/Journal of National University of Defense Technology, 2023, 45 (03): : 67 - 75
  • [2] COMPUTATION AND PROFIT ANALYSIS OF A k-OUT-OF-n:G REPAIRABLE SYSTEM UNDER N-POLICY WITH MULTIPLE VACATIONS AND ONE REPLACEABLE REPAIR FACILITY
    Wu, Wenqing
    Tang, Yinghui
    Yu, Miaomiao
    Jiang, Ying
    RAIRO-OPERATIONS RESEARCH, 2015, 49 (04) : 717 - 734
  • [3] Transient Analysis of a k-out-of-n:G System with N-Policy, Repairmen's Multiple Vacations, and Redundant Dependency
    Wu, Wenqing
    Tang, Yinghui
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2015, 2015
  • [4] Reliability analysis for a k-out-of-n:G system with redundant dependency and repairmen having multiple vacations
    Yuan, Li
    APPLIED MATHEMATICS AND COMPUTATION, 2012, 218 (24) : 11959 - 11969
  • [5] Reliability analysis of a k-out-of-n:G repairable system with single vacation
    Wu, Wenqing
    Tang, Yinghui
    Yu, Miaomiao
    Jiang, Ying
    APPLIED MATHEMATICAL MODELLING, 2014, 38 (24) : 6075 - 6097
  • [6] Optimization of repairable systems with repairman's multiple vacations
    Yedida, Sarada
    Shenbagam, R.
    INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2018, 35 (01) : 266 - 290
  • [7] Reliability of a k-out-of-n:G System with Identical Repairable Elements
    Sharifi, M.
    Nia, A. Torabi
    Shafie, P.
    Norozi-Zare, F.
    Sabet-Ghadam, A.
    NUMERICAL ANALYSIS AND APPLIED MATHEMATICS, VOLS 1 AND 2, 2009, 1168 : 385 - +
  • [8] GRAPHICAL ANALYSIS FOR K-OUT-OF-N - G-REPAIRABLE SYSTEM AND ITS APPLICATION
    ARIZONO, I
    KANAGAWA, A
    IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES, 1994, E77A (09) : 1560 - 1563
  • [9] The k=n(G) repairable system with multiple synchronous vacations of c repairmen
    Tang, Ying-Hui
    Liang, Xiao-Jun
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2013, 33 (09): : 2330 - 2338
  • [10] Computation and transient analysis of a k-out-of-n:G repairable system with general repair times
    Wu, Wenqing
    Tang, Yinghui
    Yu, Miaomiao
    Jiang, Ying
    OPERATIONAL RESEARCH, 2015, 15 (02) : 307 - 324