Two-level procedure based on HICAGA to determine optimal number, locations and operating points of SVCs in Isfahan-Khuzestan power system to maximise loadability and minimise losses, TVD and SVC installation cost

被引:3
作者
Basiri-Kejani, Mohsen [1 ]
Gholipour, Eskandar [1 ]
机构
[1] Univ Isfahan, Dept Elect Engn, Esfahan, Iran
关键词
flexible AC transmission systems; number theory; static VAr compensators; iterative methods; genetic algorithms; two-level procedure; HICAGA; optimal number; operating points; SVC; Isfahan-Khuzestan power system; loadability maximisation; loss minimisation; TVD installation cost; SVC installation cost; maximum power system loadability; bus voltages; flexible AC transmission system devices; FACTS devices; static var compensator; operating point; iterative process; line loading constraints; total voltage deviations; TVD; hybrid imperialist competitive algorithm and genetic algorithm; MULTITYPE FACTS DEVICES;
D O I
10.1049/iet-gtd.2016.0651
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Increasing maximum power system loadability while maintaining bus voltages and line loadings constraints by flexible AC transmission system (FACTS) devices is one of the main issues in power system studies. One of the shunt FACTS devices widely used in power system is static var compensator (SVC). Its performance on power system is highly dependent on its number, location and operating point. This study presents a two-level procedure to find optimal number, locations, and operating points of SVCs in a power system. At the first level, the goal is to maximise loadability of the power system. At this level, by using a method based on iterative process, applying SVCs to the power system, and increasing load factor, the optimisation algorithm seeks to find locations and operating points of SVCs that fulfil bus voltages and line loading constraints. This process continues until the increase in the number of SVCs does not lead to an increase in loadability. At the second level and for a certain number of SVCs, power system losses, total voltage deviations (TVD), and SVC installation cost are minimised at specific loadability. In this study, hybrid imperialist competitive algorithm and genetic algorithm (HICAGA) have been used for optimisation.
引用
收藏
页码:4158 / 4168
页数:11
相关论文
共 26 条
  • [1] Atashpaz-Gargari E, 2007, IEEE C EVOL COMPUTAT, P4661, DOI 10.1109/cec.2007.4425083
  • [2] Unified power flow controllers for security-constrained transmission management
    Bruno, S
    La Scala, M
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (01) : 418 - 426
  • [3] Cay L. J., 2004, IEEE PES POW SYST C, P201
  • [4] Multi-Objective Optimal SVC Installation for Power System Loading Margin Improvement
    Chang, Ya-Chin
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (02) : 984 - 992
  • [5] Chansareewittaya S., 2011, IECON 2011 - 37th Annual Conference of IEEE Industrial Electronics, P4733, DOI 10.1109/IECON.2011.6119996
  • [6] Eissa M. M., 2013, 2013 IEEE INT C SMAR, P1
  • [7] Available transfer capability calculations
    Ejebe, GC
    Tong, J
    Waight, JG
    Frame, JG
    Wang, X
    Tinney, WF
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1998, 13 (04) : 1521 - 1527
  • [8] Optimal location of multi-type FACTS devices in a power system by means of genetic algorithms
    Gerbex, S
    Cherkaoui, R
    Germond, AJ
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (03) : 537 - 544
  • [9] Ghahremani E., 2013, THESIS
  • [10] Analysing the effects of different types of FACTS devices on the steady-state performance of the Hydro-Quebec network
    Ghahremani, Esmaeil
    Kamwa, Innocent
    [J]. IET GENERATION TRANSMISSION & DISTRIBUTION, 2014, 8 (02) : 233 - 249