Petri Net-Based Scheduling Analysis of Dual-Arm Cluster Tools Subject to Wafer Revisiting and Residency Time Constraints

被引:0
|
作者
Qiao, Yan [1 ]
Wu, NaiQi [1 ]
Zhou, MengChu [2 ]
Dai, QingYun [3 ]
机构
[1] Guangdong Univ Technol, Sch Electromech Engn, Guangzhou 510006, Guangdong, Peoples R China
[2] New Jersey Inst Technol, Dept Elect & Comp Engn, Newark, NJ 07102 USA
[3] Guagdong Univ Technol, Sch Informat Engn, Guangzhou 510006, Peoples R China
来源
2013 10TH IEEE INTERNATIONAL CONFERENCE ON NETWORKING, SENSING AND CONTROL (ICNSC) | 2013年
关键词
Petri net; Scheduling; Semiconductor manufacturing;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In semiconductor fabrication, it is very challenging to schedule a cluster tool with wafer revisiting and residency time constraints. For the typical wafer revisiting process of atomic layer deposition (ALD), a Petri net model is developed for the system. Then, with it and based on a 1-wafer cyclic scheduling method previously developed by the authors of this paper, schedulability conditions and scheduling algorithms are derived. The schedulability can be checked by analytical expressions. If schedulable, an optimal 1-wafer cyclic schedule can be analytically found. It is very computationally efficient. An illustrative example is given to show the application of the proposed approach.
引用
收藏
页码:252 / 257
页数:6
相关论文
共 50 条
  • [41] How to Start-up Dual-arm Cluster Tools Involving a Wafer Revisiting Process
    Pan, ChunRong
    Zhou, MengChu
    Qiao, Yan
    2015 INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2015, : 1194 - 1199
  • [42] Scheduling of Single-Arm Cluster Tools for an Atomic Layer Deposition Process With Residency Time Constraints
    Yang, FaJun
    Wu, NaiQi
    Qiao, Yan
    Zhou, MengChu
    Li, ZhiWu
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2017, 47 (03): : 502 - 516
  • [43] Noncyclic scheduling of dual-armed cluster tools for minimization of wafer residency time and makespan
    Sakai, Masaru
    Nishi, Tatsushi
    ADVANCES IN MECHANICAL ENGINEERING, 2017, 9 (04): : 1 - 12
  • [44] Scheduling of Single-Arm Cluster Tools with Residency Time Constraints and Chamber Cleaning Operations
    Li, Jie
    Qiao, Yan
    Zhang, Siwei
    Li, Zhiwu
    Wu, Naiqi
    Song, Tairan
    APPLIED SCIENCES-BASEL, 2021, 11 (19):
  • [45] Scheduling a Single-Arm Two-Cluster Tool With a Process Module Failure Subject to Wafer Residency Time Constraints
    Zhu, Qinghua
    Yuan, Jun
    Wang, Genghong
    Hou, Yan
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2025, 22 : 667 - 679
  • [46] Petri Net-Based Polynomially Complex Approach to Optimal One-Wafer Cyclic Scheduling of Hybrid Multi-Cluster Tools in Semiconductor Manufacturing
    Yang, FaJun
    Wu, NaiQi
    Qiao, Yan
    Zhou, MengChu
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2014, 44 (12): : 1598 - 1610
  • [47] Scheduling algorithm of dual-armed cluster tools with residency time and reentrant constraints
    Zhou Bing-hai
    Gao Zhong-shun
    Chen Jia
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2014, 21 (01) : 160 - 166
  • [48] Scheduling algorithm of dual-armed cluster tools with residency time and reentrant constraints
    周炳海
    高忠顺
    陈佳
    Journal of Central South University, 2014, 21 (01) : 160 - 166
  • [49] Scheduling algorithm of dual-armed cluster tools with residency time and reentrant constraints
    Bing-hai Zhou
    Zhong-shun Gao
    Jia Chen
    Journal of Central South University, 2014, 21 : 160 - 166
  • [50] Scheduling Dual-Arm Multi-Cluster Tools With Regulation of Post-Processing Time
    Zhu, Qinghua
    Li, Bin
    Hou, Yan
    Li, Hongpeng
    Wu, Naiqi
    IEEE-CAA JOURNAL OF AUTOMATICA SINICA, 2023, 10 (08) : 1730 - 1742