A blockage removal technology for natural gas hydrates in the wellbore of an ultra-high pressure sour gas well

被引:6
|
作者
Yang Jian [1 ]
Feng Yingying [2 ]
Zhang Benjian [3 ]
Tang Yongfan [2 ,4 ]
Jiang Zeyin [2 ]
机构
[1] PetroChina Southwest Oil & Gasfield Co, Gasfield Dev Management Dept, Chengdu 610017, Sichuan, Peoples R China
[2] PetroChina Southwest Oil & Gasfield Co, Res Inst Nat Gas Technol, Chengdu 610017, Sichuan, Peoples R China
[3] PetroChina Southwest Oil & Gasfield Co, Northwest Sichuan Div, Mianyang 621709, Sichuan, Peoples R China
[4] Natl Energy R&D Ctr High Sulfur Gas Reservoir Exp, Chengdu 610213, Sichuan, Peoples R China
关键词
Ultra-high pressure gas well; H2S; Natural gas hydrate; Blockage; Autogenetic heat; Blockage remover; Simulation of heat diffusion;
D O I
10.3787/j.ngib.2020.09.017
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In order to safely, efficiently and economically remove the blockages of natural gas hydrate (NGH) in the wellbores of ultra-high pressure gas wells, this paper utilized the heat released from an independently developed autogenetic heat based solid blockage remover through chemical reaction in the wellbore to dissolve NGH and prevent it from forming again. In addition, adjustable heat generation time and heat generation amount was realized by regulating the dosage of the blockage remover. Finally, the chemically autogenetic heat based blockage removal technology was applied to remove the blockages in ultra-high pressure sour gas wells in the Sichuan Basin. And the following research results were obtained. First, when the independently developed chemically autogenetic heat based solid blockage remover is adopted, the peak temperature (34.2-88.5 degrees C) and time (24.2-884.0 min) of heat generation can be adjusted by its dosage. What's more, there is NGH inhibitor in the reaction product, which can inhibit the regeneration of NGH. Second, as the concentration of the blockage remover increases, the heat transfer speed increases, leading to an increase of NGH dissociation rate around the blockage remover. Third, blockage removal time increases with the increase of wellbore ID. In addition, the increasing rate of the blockage removal time as the wellbore ID increases from 64 mm to 76 mm is lower than that from 76 mm to 102 mm. Fourth, the coincidence rate between the simulation calculation result of heat diffusion and the on-site actual consumption is more than 85%, which indicates that the proposed model for the heat diffusion of chemically autogenetic heat based blockage remover is reliable and can be used to calculate the dosage of blockage remover. Fifth, solid reagent adding device with resistance to sulfur and pressure of 140 MPa is used to add autogenetic heat based solid blockage remover. This blockage remover has been applied in the ultra-high pressure sour gas wells in the Sichuan Basin three well times. Thanks to its application, NGH blockages in these wells are removed successfully and their production is resumed smoothly. In conclusion, this blockage removal technology has such advantages as effective blockage removal, safe and simple on-site operation and low cost, and a promising application prospect. (C) 2021 Sichuan Petroleum Administration. Publishing services by Elsevier B.V. on behalf of KeAi Communication Co. Ltd.
引用
收藏
页码:188 / 194
页数:7
相关论文
共 50 条
  • [21] Ultra-high gas pressure pipelines offer advantages for arctic service
    King, Graeme
    Oil and Gas Journal, 1992, 90 (22): : 79 - 84
  • [22] Pressure estimation of ultra-high frequency ultrasound using gas vesicles
    Strohm, Eric M.
    Wu, Di
    Malounda, Dina
    Nayak, Rohit
    Shapiro, Mikhail G.
    Kolios, Michael C.
    Journal of the Acoustical Society of America, 2024, 156 (06): : 4193 - 4201
  • [23] Investigation of Ultra-High Pressure Gas Control System for Hydrogen Vehicles
    Kim, Roh-Won
    Hwang, Kyung-Hwan
    Kim, Sung-Ryul
    Lee, Jae-Hak
    ENERGIES, 2020, 13 (10)
  • [24] Study on the coupling model of wellbore temperature and pressure during the production of high temperature and high pressure gas well
    Liu, Xiangkang
    Liu, Liming
    Yu, Zhaocai
    Zhang, Lin
    Zhou, Lang
    Zhang, Zheng
    Guo, Fang
    ENERGY REPORTS, 2022, 8 : 1249 - 1257
  • [25] Wellbore storage removal in pressure transient analysis for gas wells
    Khalaf, Mina S.
    Soliman, Noha
    El-Banbi, Ahmed H.
    JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2022, 208
  • [26] Laboratory investigation of pressure development of natural gas hydrates
    Hao, Yong-Mao
    Bo, Qi-Wei
    Chen, Yue-Ming
    Li, Shu-Xia
    Shiyou Kantan Yu Kaifa/Petroleum Exploration and Development, 2006, 33 (02): : 217 - 220
  • [27] Wellbore flow characteristics of heavy oil injected with natural gas at high temperature and high pressure
    Hu G.
    Zhongguo Shiyou Daxue Xuebao (Ziran Kexue Ban)/Journal of China University of Petroleum (Edition of Natural Science), 2019, 43 (04): : 91 - 97
  • [28] Identification of low and medium intensity gas leakage location in medium and ultra-high pressure gas pipelines
    Kurbatova, Galina I.
    Klemeshev, Vladimir A.
    VESTNIK SANKT-PETERBURGSKOGO UNIVERSITETA SERIYA 10 PRIKLADNAYA MATEMATIKA INFORMATIKA PROTSESSY UPRAVLENIYA, 2023, 19 (02): : 218 - 232
  • [29] Prediction of natural gas hydrate formation region in wellbore during deepwater gas well testing
    王志远
    孙宝江
    王雪瑞
    张振楠
    JournalofHydrodynamics, 2014, 26 (04) : 568 - 576