共 20 条
[11]
MICKALIGER MJ, 2001, BEST VALUE CONTRACTI, P52
[12]
*OFF FED PROC POL, 1998, GUID BEST PRACT PERF
[13]
CAUSES OF HIGH COSTS OF CONSTRUCTION IN NIGERIA
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1988, 114 (02)
:233-244
[14]
PALANEESWARAN E, 2000, THESIS U HONG KONG H
[15]
Russell JS, 1999, CIVIL ENG, V69, P60
[16]
*US ARM MAT COMM, 1998, CONTR BEST VAL BEST
[17]
WRIGHT G, 1998, BUILDING DESIGN CONS, V39, P52
[19]
[No title captured]
[20]
[No title captured]