Public clients' best value perspectives of public private partnerships in infrastructure development

被引:62
作者
Zhang, XQ [1 ]
机构
[1] Minist Water Resources China, Yellow River Conservancy Committee, Zhengzhou 450003, Peoples R China
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 2006年 / 132卷 / 02期
关键词
D O I
10.1061/(ASCE)0733-9364(2006)132:2(107)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The multiple objectives of public clients in formulating partnerships with the private sector in infrastructure development and the radical realignment of risks, responsibilities, and awards among project participants in such partnerships necessitate a best value source selection (BVSS) methodology to choose the right private sector partner who assumes far more and much deeper risks than a mere contractor. One critical step in adopting the BVSS is to express the client's objectives in terms of best value contributing factors (BVCFs), against which alternative proposals are evaluated and consequently a sound and defensible contract award decision made. A set of 21 BVCFs in public private partnerships (PPPs) has been identified through literature review of BVCFs in different types of contracts, case studies of worldwide PPP practices, and interviews or correspondence with international PPP experts and experienced practitioners. The relative significance of these BVCFs is statistically analyzed based on a questionnaire survey of worldwide expert opinions. Results show that there is no statistical difference in the rating of these BVCFs between responses from academia and those from industry. Except for four BVCFs that are at a significance level between "fairly significant" and "significant" according to overall, academic, or industrial responses, all other BVCFs are at a significance level greater than "significant." These research outputs facilitate a BVSS process for PPPs in general.
引用
收藏
页码:107 / 114
页数:8
相关论文
共 20 条
[1]  
Akintoye A., 2003, Construct. Manage. Econ, V21, P461, DOI [DOI 10.1080/0144619032000087285, 10.1080/0144619032000087285]
[2]  
[Anonymous], 2000, BOO BOT PROJECTS COM
[3]   Warranting quality of steel bridge coating [J].
Chang, LM ;
Georgy, ME ;
AbdelRazig, YA .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (05) :374-380
[4]  
*DES BUILD I AM, 1999, DES BUILD MAN PRACT
[5]  
Ellicott M. A., 1996, AACE T
[6]   A+B BIDDING METHOD - HIDDEN SUCCESS STORY FOR HIGHWAY CONSTRUCTION [J].
HERBSMAN, ZJ .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (04) :430-437
[7]  
Higher Education Funding Council for England, 1997, PRACT GUID PFI HIGH
[8]  
Kelly ES, 1998, J AM WATER WORKS ASS, V90, P34
[9]  
KEPNER CH, 1981, NEW RAT MANAGER
[10]  
Levy S.M., 1996, Build, operate, transfer: paving the way for tomorrow's infrastructure