Research on dynamic modeling and operation optimization technology of CCHP system in port

被引:0
作者
Gu, Ming [1 ]
Du, Wei [1 ]
Tian, Teng [1 ]
机构
[1] 2618,Xingang Rd 2, Tianjin, Peoples R China
来源
PROCEEDINGS OF THE 2016 5TH INTERNATIONAL CONFERENCE ON SUSTAINABLE ENERGY AND ENVIRONMENT ENGINEERING (ICSEEE 2016) | 2016年 / 63卷
关键词
distributed combined cooling heating and power; power determined by heat; heat determined by power;
D O I
暂无
中图分类号
R4 [临床医学];
学科分类号
1002 ; 100602 ;
摘要
Three kinds of optimization evaluation method of distributed combined cooling heating and power (CCHP) system are analyzed, including thermodynamic performance evaluation method, environmental characteristics evaluation method and economic evaluation method. The objective function is determined as the minimum exergy economic coefficient, minimum life cycle cost, maximum net present value and reasonable incremental investment recovery period. The load gross and economic parameter of two kinds of load matching schemes including "power determined by heat" and "heat determined by power" are simulated and analyzed. By comparing the initial investment, natural gas cost, power generating revenue, heating and cooling revenue and recovery period of two different schemes, the "heat determined by power" scheme is more suitable for the port environment and building characteristics.
引用
收藏
页码:194 / 198
页数:5
相关论文
共 7 条
[1]  
Chicco G., 2007, RENEW SUST ENERG REV, V13, P535
[2]  
[冯志兵 Feng Zhibing], 2005, [热能动力工程, Journal of Engineering for Thermal Energy and Power], V20, P425
[3]   Sensitivity analysis of energy demands on performance of CCHP system [J].
Li, C. Z. ;
Shi, Y. M. ;
Huang, X. H. .
ENERGY CONVERSION AND MANAGEMENT, 2008, 49 (12) :3491-3497
[4]  
Li Wei, 2011, J ELECT POWER, V26, P487
[5]  
Li Yuhong, 2003, THESIS, P6
[6]  
[林汝谋 Lin Rumou], 2003, [动力工程, Power engineering], V23, P2370
[7]  
[王雁凌 Wang Yanling], 2016, [电力系统自动化, Automation of Electric Power Systems], V40, P136