A Cooperative Scheduling Model for Timetable Optimization in Subway Systems

被引:254
作者
Yang, Xin [1 ]
Li, Xiang [1 ]
Gao, Ziyou [1 ]
Wang, Hongwei [1 ]
Tang, Tao [1 ]
机构
[1] Beijing Jiaotong Univ, State Key Lab Rail Traff Control & Safety, Beijing 100044, Peoples R China
基金
高等学校博士学科点专项科研基金; 国家高技术研究发展计划(863计划); 中国国家自然科学基金;
关键词
Cooperative scheduling; genetic algorithm; regenerative braking; subway systems; timetable; GENETIC ALGORITHM; TRAIN; GENERATION;
D O I
10.1109/TITS.2012.2219620
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In subway systems, the energy put into accelerating trains can be reconverted into electric energy by using the motors as generators during the braking phase. In general, except for a small part that is used for onboard purposes, most of the recovery energy is transmitted backward along the conversion chain and fed back into the overhead contact line. To improve the utilization of recovery energy, this paper proposes a cooperative scheduling approach to optimize the timetable so that the recovery energy that is generated by the braking train can directly be used by the accelerating train. The recovery that is generated by the braking train is less than the required energy for the accelerating train; therefore, only the synchronization between successive trains is considered. First, we propose the cooperative scheduling rules and define the overlapping time between the accelerating and braking trains for a peak-hours scenario and an off-peak-hours scenario, respectively. Second, we formulate an integer programming model to maximize the overlapping time with the headway time and dwell time control. Furthermore, we design a genetic algorithm with binary encoding to solve the optimal timetable. Last, we present six numerical examples based on the operation data from the Beijing Yizhuang subway line in China. The results illustrate that the proposed model can significantly improve the overlapping time by 22.06% at peak hours and 15.19% at off-peak hours.
引用
收藏
页码:438 / 447
页数:10
相关论文
共 45 条
[1]  
Abe K, 2004, ADV BOUND ELEM SER, V19, P229
[2]   Genetic programming for the automatic design of. controllers for a surface ship [J].
Alfaro-Cid, Eva ;
McGookin, Euan W. ;
Murray-Smith, David J. ;
Fossen, Thor I. .
IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2008, 9 (02) :311-321
[3]  
Amit I., 1971, DEV OPERATIONS RES, V2, P379
[4]  
[Anonymous], 2000, Ph.D. thesis
[5]   A column generation approach to train timetabling on a corridor [J].
Cacchiani, Valentina ;
Caprara, Alberto ;
Toth, Paolo .
4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2008, 6 (02) :125-142
[6]   Nominal and robust train timetabling problems [J].
Cacchiani, Valentina ;
Toth, Paolo .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 219 (03) :727-737
[7]   A Lagrangian Heuristic for Robustness, with an Application to Train Timetabling [J].
Cacchiani, Valentina ;
Caprara, Alberto ;
Fischetti, Matteo .
TRANSPORTATION SCIENCE, 2012, 46 (01) :124-133
[8]   Non-cyclic train timetabling and comparability graphs [J].
Cacchiani, Valentina ;
Caprara, Alberto ;
Toth, Paolo .
OPERATIONS RESEARCH LETTERS, 2010, 38 (03) :179-184
[9]   The periodic service intention as a conceptual framework for generating timetables with partial periodicity [J].
Caimi, Gabrio ;
Laumanns, Marco ;
Schuepbach, Kaspar ;
Woerner, Stefan ;
Fuchsberger, Martin .
TRANSPORTATION PLANNING AND TECHNOLOGY, 2011, 34 (04) :323-339
[10]   Optimizing the demand captured by a railway system with a regular timetable [J].
Cordone, Roberto ;
Redaelli, Francesco .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2011, 45 (02) :430-446