MILP models to minimise makespan in additive manufacturing machine scheduling problems

被引:75
|
作者
Kucukkoc, Ibrahim [1 ]
机构
[1] Balikesir Univ, Dept Ind Engn, Cagis Campus, Balikesir, Turkey
关键词
Additive manufacturing; 3D printing; Scheduling; Mathematical modelling; MILP; BATCH PROCESSING MACHINES; ARBITRARY JOB SIZES; OPTIMIZATION; COMPLEXITY;
D O I
10.1016/j.cor.2019.01.006
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Additive manufacturing (AM), also known as 3D printing, is gaining enormous importance in the production of highly customised quality and lightweight products in low quantities. In addition to AM's use in producing fully functional industrial components, it is also seen as a technology of the future that will enable civilisation in space. Although the cost structures for AM facilities have been sufficiently studied in the literature, no effort has been made to investigate the scheduling problem of AM machines with the aim of optimising processing time-related performance measures. This paper focuses on the scheduling problem of single and multiple AM machines and proposes mathematical models for optimisation. Mixed-integer linear programming models allocate parts into jobs to be produced on AM machines to minimise makespan. The problem was handled by considering different machine configurations (i.e. single machine, parallel identical machines, and parallel non-identical machines). The models were coded in IBM ILOG CPLEX Optimization Studio (v12.8.0) and solved through the CPLEX solver. This paper presents detailed solutions for numerical examples. A comprehensive computational study was also conducted, and the results are presented. The optimum solutions are reported for most problems. The best solutions obtained within the time limit (i.e. 1800 and 2400 s) are reported for the parallel identical and non-identical AM machine scheduling problems if optimum solution could not be verified. (C) 2019 Elsevier Ltd. All rights reserved.
引用
收藏
页码:58 / 67
页数:10
相关论文
共 50 条
  • [21] MINIMIZING THE MAKESPAN IN TWO-MACHINE JOB SHOP SCHEDULING PROBLEMS WITH NO MACHINE IDLE-TIME
    Hermes, Fatma
    Carlier, Jacques
    Moukrim, Aziz
    Ghedira, Khaled
    ICINCO 2009: PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS, VOL 1: INTELLIGENT CONTROL SYSTEMS AND OPTIMIZATION, 2009, : 89 - +
  • [22] Parallel machine scheduling problems in green manufacturing industry
    Li, Kai
    Zhang, Xun
    Leung, Joseph Y. -T.
    Yang, Shan-Lin
    JOURNAL OF MANUFACTURING SYSTEMS, 2016, 38 : 98 - 106
  • [23] A Simulated Annealing Heuristic for Minimizing Makespan in Parallel Machine Scheduling
    Laha, Dipak
    SWARM, EVOLUTIONARY, AND MEMETIC COMPUTING, (SEMCCO 2012), 2012, 7677 : 198 - 205
  • [24] Part-grouping and build-scheduling with sequence-dependent setup time to minimize the makespan for non-identical parallel additive manufacturing machines
    Kim, Yong Jae
    Kim, Byung Soo
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2022, 119 (3-4) : 2247 - 2258
  • [25] Optimal decomposition approach for solving large nesting and scheduling problems of additive manufacturing systems
    Nascimento, Paulo Jorge
    Silva, Cristovao
    Antunes, Carlos Henggeler
    Moniz, Samuel
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 317 (01) : 92 - 110
  • [26] Minimizing Makespan for Machine Scheduling and Worker Assignment Problem in Identical Parallel Machine Models Using GA
    Chaudhry, Imran Ali
    Mahmood, Sultan
    Ahmad, Riaz
    WORLD CONGRESS ON ENGINEERING, WCE 2010, VOL III, 2010, : 2464 - 2469
  • [27] Additive manufacturing scheduling problem considering assembly operations of parts
    Oğuzhan Ahmet Arık
    Operational Research, 2022, 22 : 3063 - 3087
  • [28] Scheduling of build and post processes for decomposed parts in additive manufacturing
    Oh, Yosep
    Cho, Yongkyu
    ADDITIVE MANUFACTURING, 2022, 59
  • [29] Additive manufacturing scheduling problem considering assembly operations of parts
    Arik, Oguzhan Ahmet
    OPERATIONAL RESEARCH, 2022, 22 (03) : 3063 - 3087
  • [30] Event-based MILP models for resource-constrained project scheduling problems
    Kone, Oumar
    Artigues, Christian
    Lopez, Pierre
    Mongeau, Marcel
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 3 - 13