An evaluation method of distributed generation credible capacity based on island partition

被引:9
作者
Chen Jiahao [1 ]
Sun Bing [1 ]
Li Yunfei [1 ]
Jing Ruipeng [1 ]
Zeng Yuan [1 ]
Li Minghao [2 ]
机构
[1] Tianjin Univ, Minist Educ, Key Lab Smart Grid, Tianjin, Peoples R China
[2] State Grid Tianjin Elect Power Co Ltd, Tianjin, Peoples R China
关键词
Island partition model; Distributed generation credible capacity; Hypothesis test; Equal power supply reliability criterion; Sequential Monte Carlo simulation; Prospective greedy algorithm; SMART DISTRIBUTION-SYSTEMS; RELIABILITY EVALUATION; POWER-SYSTEM; DEMAND RESPONSE; WIND ENERGY; IMPACTS; NETWORK; HEAT;
D O I
10.1016/j.egyr.2022.08.251
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Distributed generation (DG) has not only electricity value, but also capacity value. The capacity value can be represented by the credible capacity (CC) based on the equal power supply reliability criterion. The evaluation of reliability on distribution network (DN) is the core of CC calculation. Under a fault state, DGs can continue to supply power to some load by the island operating mode, and the DN reliability can be improved. Therefore, it is necessary to utilize the power supply restoration potential of DG and formulate an island partition scheme accurately in the reliability calculation of DN. A DG CC evaluation method based on island partition is proposed in the paper. The power supply reliability of an active distribution network is evaluated based on an island partition model, to realize the accurate evaluation of DG CC. The main work is as follows: First, an island partition model under a random fault state of DN is established. The fluctuation of DGs and load, interconnection switch, load priority, secondary outage constraint and other factors are fully considered in reliability assessment. A heuristic prospective greedy algorithm and the Prim algorithm are used to solve the island partition model accurately. Second, a reliability evaluation method of DN based on sequential Monte Carlo simulation (SMCS) is proposed. The system reliability level can be accurately analyzed under a fault state. Then, a CC evaluation method based on hypothesis testing is proposed. The convergence of the CC searching process can be scientifically judged by checking the conspicuousness of the reliability indices distribution obtained by the SMCS. Finally, a case study of the PG&E 69-bus system is analyzed. The topology of the DN, permeability of the DG and island partition strategy are known to have a significant impact on the DG CC. (C) 2022 The Author(s). Published by Elsevier Ltd.
引用
收藏
页码:11271 / 11287
页数:17
相关论文
共 41 条
[1]   Multiobjective generation expansion planning considering power system adequacy [J].
Aghaei, Jamshid ;
Akbari, Mohammad Amin ;
Roosta, Alireza ;
Baharvandi, Amir .
ELECTRIC POWER SYSTEMS RESEARCH, 2013, 102 :8-19
[2]   A review on intentional controlled islanding in smart power systems and generalized framework for ICI in microgrids [J].
Ahangar, Amir Reza Hassani ;
Gharehpetian, Gevork B. ;
Baghaee, Hamid Reza .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2020, 118
[3]   Comparison of Capacity Credit Calculation Methods for Conventional Power Plants and Wind Power [J].
Amelin, Mikael .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2009, 24 (02) :685-691
[4]  
Bethany F., 2017, 8760 BASED METHOD RE
[5]   Capacity credit evaluation of wind energy using a robust secant method incorporating improved importance sampling [J].
Cai, Jilin ;
Xu, Qingshan .
SUSTAINABLE ENERGY TECHNOLOGIES AND ASSESSMENTS, 2021, 43
[6]   Reliability assessment method of composite power system with wind farms and its application in capacity credit evaluation of wind farms [J].
Chen, Fan ;
Li, Fangxing ;
Feng, Wei ;
Wei, Zhinong ;
Cui, Hantao ;
Liu, Haitao .
ELECTRIC POWER SYSTEMS RESEARCH, 2019, 166 :73-82
[7]   Capacity credit of microgeneration and microgrids [J].
Costa, Paulo Moises ;
Matos, Manuel A. .
ENERGY POLICY, 2010, 38 (10) :6330-6337
[8]   Redesigning capacity market to include flexibility via ramp constraints in high-renewable penetrated system [J].
Fang, Xin ;
Hu, Qinran ;
Bo, Rui ;
Li, Fangxing .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2021, 128
[9]   The capacity credit of micro-combined heat and power [J].
Hawkes, A. D. ;
Leach, M. A. .
ENERGY POLICY, 2008, 36 (04) :1457-1469
[10]   Optimal island partitioning of smart distribution systems to improve system restoration under emergency conditions [J].
Hosseinnezhad, Vahid ;
Rafiee, Mansour ;
Ahmadian, Mohammad ;
Siano, Pierluigi .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2018, 97 :155-164