Analysis of optimisation issues in multi-period DWDM network planning
被引:0
|
作者:
Geary, N
论文数: 0引用数: 0
h-index: 0
机构:
Lucent Technol, London W1H 9AB, EnglandLucent Technol, London W1H 9AB, England
Geary, N
[1
]
Antonopoulos, A
论文数: 0引用数: 0
h-index: 0
机构:
Lucent Technol, London W1H 9AB, EnglandLucent Technol, London W1H 9AB, England
Antonopoulos, A
[1
]
Drakopoulos, E
论文数: 0引用数: 0
h-index: 0
机构:
Lucent Technol, London W1H 9AB, EnglandLucent Technol, London W1H 9AB, England
Drakopoulos, E
[1
]
O'Reilly, J
论文数: 0引用数: 0
h-index: 0
机构:
Lucent Technol, London W1H 9AB, EnglandLucent Technol, London W1H 9AB, England
O'Reilly, J
[1
]
机构:
[1] Lucent Technol, London W1H 9AB, England
来源:
IEEE INFOCOM 2001: THE CONFERENCE ON COMPUTER COMMUNICATIONS, VOLS 1-3, PROCEEDINGS: TWENTY YEARS INTO THE COMMUNICATIONS ODYSSEY
|
2001年
关键词:
optical networks;
multi-period planning;
D O I:
暂无
中图分类号:
TP [自动化技术、计算机技术];
学科分类号:
0812 ;
摘要:
Techniques for the planning of mufti-service telecommunications networks over a mufti-period scenario are proposed, based on routing optimisation to reduce network cost by removing DWDM transmission systems. A model of a medium-size national network is optimised using the various techniques, and the results presented in terms of the total number of DWDM systems required and the amount of wavelength-hops (giving an indication toward the number of optical transponders required). Traffic is taken as a mix between unprotected and 1+1 SNCP optical path protected demands. Traffic growth is applied over the 5 year planning horizon to give a tenfold increase in total traffic volume for the final year. A greenfield situation is assumed, yet since deployment occurs over several years, a Present Value calculation is used to estimate total cost, assuming that transponders and systems are only installed when they are due to be 'lit'.
机构:
Elect Power Co Serbia, Elektrovojvodina, Dispatcher Ctr, Subotica 24000, SerbiaElect Power Co Serbia, Elektrovojvodina, Dispatcher Ctr, Subotica 24000, Serbia
Popovic, Z. N.
Popovic, D. S.
论文数: 0引用数: 0
h-index: 0
机构:
Univ Novi Sad, Fac Tech Sci, Novi Sad 21000, SerbiaElect Power Co Serbia, Elektrovojvodina, Dispatcher Ctr, Subotica 24000, Serbia
机构:
State Grid Corp China, State Grid Southwest Branch Corp, Chengdu 610095, Peoples R ChinaState Grid Corp China, State Grid Southwest Branch Corp, Chengdu 610095, Peoples R China
Shen, Li
Jiang, Li
论文数: 0引用数: 0
h-index: 0
机构:
State Grid Corp China, State Grid Southwest Branch Corp, Chengdu 610095, Peoples R ChinaState Grid Corp China, State Grid Southwest Branch Corp, Chengdu 610095, Peoples R China
Jiang, Li
Wang, Qing
论文数: 0引用数: 0
h-index: 0
机构:
State Grid Corp China, State Grid Southwest Branch Corp, Chengdu 610095, Peoples R ChinaState Grid Corp China, State Grid Southwest Branch Corp, Chengdu 610095, Peoples R China
Wang, Qing
Wen, Yiyu
论文数: 0引用数: 0
h-index: 0
机构:
State Grid Corp China, State Grid Southwest Branch Corp, Chengdu 610095, Peoples R ChinaState Grid Corp China, State Grid Southwest Branch Corp, Chengdu 610095, Peoples R China
Wen, Yiyu
Liu, Tingjian
论文数: 0引用数: 0
h-index: 0
机构:
Sichuan Univ, Coll Elect Engn, Chengdu 610065, Peoples R ChinaState Grid Corp China, State Grid Southwest Branch Corp, Chengdu 610095, Peoples R China