Analysis of optimisation issues in multi-period DWDM network planning

被引:0
|
作者
Geary, N [1 ]
Antonopoulos, A [1 ]
Drakopoulos, E [1 ]
O'Reilly, J [1 ]
机构
[1] Lucent Technol, London W1H 9AB, England
来源
IEEE INFOCOM 2001: THE CONFERENCE ON COMPUTER COMMUNICATIONS, VOLS 1-3, PROCEEDINGS: TWENTY YEARS INTO THE COMMUNICATIONS ODYSSEY | 2001年
关键词
optical networks; multi-period planning;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Techniques for the planning of mufti-service telecommunications networks over a mufti-period scenario are proposed, based on routing optimisation to reduce network cost by removing DWDM transmission systems. A model of a medium-size national network is optimised using the various techniques, and the results presented in terms of the total number of DWDM systems required and the amount of wavelength-hops (giving an indication toward the number of optical transponders required). Traffic is taken as a mix between unprotected and 1+1 SNCP optical path protected demands. Traffic growth is applied over the 5 year planning horizon to give a tenfold increase in total traffic volume for the final year. A greenfield situation is assumed, yet since deployment occurs over several years, a Present Value calculation is used to estimate total cost, assuming that transponders and systems are only installed when they are due to be 'lit'.
引用
收藏
页码:152 / 158
页数:7
相关论文
共 40 条
  • [21] The Multi-Period Workforce Scheduling and Routing Problem *
    Guastaroba, G.
    Cote, J. -F.
    Coelho, L. C.
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2021, 102
  • [22] Multi-period hub location problems in transportation
    Gelareh, Shahin
    Monemi, Rahimeh Neamatian
    Nickel, Stefan
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2015, 75 : 67 - 94
  • [23] An integrated MILP model for optimal planning of multi-period onshore gas field gathering pipeline system
    Hong, Bingyuan
    Li, Xiaoping
    Di, Guojia
    Song, Shangfei
    Yu, Weichao
    Chen, Shilin
    Li, Yu
    Gong, Jing
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 146
  • [24] Multi-period planning in metro-aggregation networks exploiting point-to-multipoint coherent transceivers
    Hosseini, Mohammad Mohammad
    Pedro, Joao
    Napoli, Antonio
    Costa, Nelson
    Prilepsky, Jaroslaw E.
    Turitsyn, Sergei K.
    JOURNAL OF OPTICAL COMMUNICATIONS AND NETWORKING, 2023, 15 (03) : 155 - 162
  • [25] Incorporating demand dynamics in multi-period capacitated fast-charging location planning for electric vehicles
    Zhang, Anpeng
    Kang, Jee Eun
    Kwon, Changhyun
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2017, 103 : 5 - 29
  • [26] Optimization Model for Multi-Time Period LTE Network Planning
    Ageyev, Dmytro
    Al-Anssari, Ali
    2014 FIRST INTERNATIONAL SCIENTIFIC-PRACTICAL CONFERENCE PROBLEMS OF INFOCOMMUNICATIONS SCIENCE AND TECHNOLOGY (PIC S&T), 2014, : 29 - 30
  • [27] Hybrid evolutionary algorithms and Lagrangian relaxation for multi-period star hub median problem considering financial and service quality issues
    Tikani, Hamid
    Ramezanian, Reza
    Setak, Mostafa
    Van Woensel, Tom
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2021, 97
  • [28] Multi-Domain DWDM Network Provisioning For Correlated Failures
    Esmaeili, M.
    Peng, M.
    Khan, S.
    Finochietto, J.
    Jin, Y.
    Ghani, N.
    2011 OPTICAL FIBER COMMUNICATION CONFERENCE AND EXPOSITION (OFC/NFOEC) AND THE NATIONAL FIBER OPTIC ENGINEERS CONFERENCE, 2011,
  • [29] A subway planning bi-objective multi-period optimization model integrating timetabling and vehicle scheduling: a case study of Tehran
    Heidari, Mitra
    Hosseini-Motlagh, Seyyed-Mahdi
    Nikoo, Nariman
    TRANSPORTATION, 2020, 47 (01) : 417 - 443
  • [30] A subway planning bi-objective multi-period optimization model integrating timetabling and vehicle scheduling: a case study of Tehran
    Mitra Heidari
    Seyyed-Mahdi Hosseini-Motlagh
    Nariman Nikoo
    Transportation, 2020, 47 : 417 - 443