Optimal allocation of inspection effort over a finite planning horizon

被引:16
作者
Kogan, K [1 ]
Raz, T
机构
[1] Bar Ilan Univ, Dept Interdisciplinary Studies Logist, IL-52900 Ramat Gan, Israel
[2] Tel Aviv Univ, Leon Recanati Grad Sch Business Adm, Fac Management, IL-69978 Tel Aviv, Israel
关键词
D O I
10.1080/07408170208928888
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We address the problem of managing the intensity, sequence and timing of inspection effort in an N-stage production system with M inspection activities possible at each stage. The objective is to minimize the sum of the inspection costs and the penalties caused by undetected defects. By means of the maximum principle we prove several properties of the optimal solution, which allow us to reduce the continuous-time inspection effort allocation problem to a combinatorial one. We suggest an efficient algorithm that solves the problem in O(NM2+N-2) time.
引用
收藏
页码:515 / 527
页数:13
相关论文
共 8 条
[1]  
[Anonymous], 1998, OPTIMAL FLOW CONTROL
[2]   Capacity planning under different inspection strategies [J].
Gurnani, H ;
Drezner, Z ;
Akella, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 89 (02) :302-312
[3]   OPTIMAL SEQUENCING OF PRODUCTION AND INSPECTION OPERATIONS [J].
KASPI, M ;
RAZ, T .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (01) :209-221
[4]   Inspection sequencing and part scheduling for flexible manufacturing systems [J].
Lee, J ;
Chen, FF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 95 (02) :344-355
[5]  
Lee J., 1994, Manufacturing Review, V7, P164
[6]  
Rabinowitz G, 1997, IIE TRANS, V29, P1063, DOI 10.1080/07408179708966425
[7]   LOCATION AND SEQUENCING OF IMPERFECT INSPECTION OPERATIONS IN SERIAL MULTISTAGE PRODUCTION SYSTEMS [J].
RAZ, T ;
KASPI, M .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (08) :1645-1659
[8]  
TANG CS, 1991, EUROPEAN J OPERATION, V53, P45