Static scheduling in consideration of resource categories in collaborative product development project

被引:57
作者
Li, Yingzi [1 ]
Zhang, Shuo [2 ]
机构
[1] Univ Sci & Technol Beijing, Donlinks Sch Econ & Management, Beijing 100083, Peoples R China
[2] North China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R China
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
Collaborative product development; static scheduling; resource categories; genetic algorithm; ALGORITHM;
D O I
10.1177/1687814015606301
中图分类号
O414.1 [热力学];
学科分类号
摘要
In collaborative product development project plan phase, a reasonable allocation plan can shorten project duration. Static scheduling is a useful way to obtain the allocation result. Matching degree and resource categories are introduced into the standard model of multi-mode resource-constrained project scheduling problem to reflect the resource characteristics including three aspects: (1) human resource is different from technology resource, (2) different technology resources will influence project duration, and (3) technology resource quantities also influence duration. Aimed at two static scheduling models, simple genetic algorithm and two-layer parthenogenetic algorithm are designed. Finally, a case study was presented to validate the method.
引用
收藏
页码:1 / 9
页数:9
相关论文
共 19 条
[1]   Multi-mode resource constrained multi-project scheduling and resource portfolio problem [J].
Besikci, Umut ;
Bilge, Umit ;
Ulusoy, Gunduz .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 240 (01) :22-31
[2]   Resource-constrained project scheduling: Notation, classification, models, and methods [J].
Brucker, P ;
Drexl, A ;
Mohring, R ;
Neumann, K ;
Pesch, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) :3-41
[3]   Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting [J].
Cheng, Junzilan ;
Fowler, John ;
Kempf, Karl ;
Mason, Scott .
COMPUTERS & OPERATIONS RESEARCH, 2015, 53 :275-287
[4]  
Colak S, 2013, J BUS EC RES, V11, P455
[5]   Differential evolution for solving multi-mode resource-constrained project scheduling problems [J].
Damak, N. ;
Jarboui, B. ;
Siarry, P. ;
Loukil, T. .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (09) :2653-2659
[6]   A survey of variants and extensions of the resource-constrained project scheduling problem [J].
Hartmann, Soenke ;
Briskorn, Dirk .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (01) :1-14
[7]  
[黄敏镁 Huang Minmei], 2010, [管理工程学报, Journal of Industrial Engineering and Engineering Management], V24, P143
[8]  
[敬石开 JING Shi-kai], 2009, [制造业自动化, Manufacturing Automation], V31, P102
[9]   A particle swarm optimization based hyper-heuristic algorithm for the classic resource constrained project scheduling problem [J].
Koulinas, Georgios ;
Kotsikas, Lazaros ;
Anagnostopoulos, Konstantinos .
INFORMATION SCIENCES, 2014, 277 :680-693
[10]  
Li M.J., 2002, Ph.D. Thesis