The best vendor selection for conducting the recycled material based on a hybrid MCDM model combining DANP with VIKOR

被引:159
作者
Hsu, C. -H. [1 ]
Wang, Fu-Kwun [1 ]
Tzeng, Gwo-Hshiung [2 ,3 ,4 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei 106, Taiwan
[2] Kainan Univ, Inst Project Management, Tao Yuan 338, Taiwan
[3] Kainan Univ, Dept Business & Entrepreneurial Management, Tao Yuan 338, Taiwan
[4] Natl Chiao Tung Univ, Inst Management Technol, Hsinchu 300, Taiwan
关键词
Vendor selection (VS); Recycled materials; Multiple criteria decision making (MCDM); Analytic network process (ANP); Supply chain management; GREEN SUPPLY CHAIN; ANALYTIC HIERARCHY PROCESS; DECISION-SUPPORT-SYSTEM; MULTICRITERIA ANALYSIS; PROJECT SELECTION; MULTIPLE CRITERIA; NETWORK PROCESS; FUZZY APPROACH; MANAGEMENT; STRATEGY;
D O I
10.1016/j.resconrec.2012.02.009
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Environmentally conscious manufacturing and product recovery (ECMPRO) has become an obligation of manufacturers, and it has been extended to be the policy and strategy of businesses. Producing recyclable products and using recycled materials are optimal strategies for ECMPRO. Vendor selection (VS) is one of the multiple criteria decision-making (MCDM) problems in strategic supply chain management. The purpose of this article is to propose how the best selection to conduct the recycled materials can be implemented for enhancing and increasing the efficiency of using resources in the manufacturing process through recycled materials VS. Aluminum composite panel (ACP) is a global product, and ACP companies in Taiwan use recycled materials in more than 80% for their products on a quantity basis. Therefore, we selected the ACP industry of Taiwan as an empirical model to study VS and to reveal methods of improving gaps in each criterion for achieving the aspired levels of performance. We use the MCDM model combining DEMATEL-based on ANP (called DANP) with VIKOR to solve the recycled materials VS problems of multiple dimensions and criteria that are interdependent, instead of the independent assumption of an analytic hierarchy process, for mimicking the real-world scenario. (c) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:95 / 111
页数:17
相关论文
共 59 条
[1]  
Albino V., 1998, International Journal of Project Management, V16, P9, DOI DOI 10.1061/(ASCE)CO.1943-7862.0000184
[2]  
[Anonymous], 1976, DEMATEL OBSERVE
[3]  
[Anonymous], 1999, P 5 INT S ANALYTIC H
[4]  
Barbarosoglu G, 1997, PRODUCTION INVENTORY, P14
[5]   Integrated model for supplier selection and negotiation in a make-to-order environment [J].
Cakravastia, A ;
Takahashi, K .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (21) :4457-4474
[6]   Global supplier development considering risk factors using fuzzy extended AHP-based approach [J].
Chan, Felix T. S. ;
Kumar, Niraj .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2007, 35 (04) :417-431
[7]  
CHEN RW, 1993, PROCEEDINGS OF THE 1993 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS AND THE ENVIRONMENT, P178, DOI 10.1109/ISEE.1993.302813
[8]   Measures and evaluation for environment watershed plans using a novel hybrid MCDM model [J].
Chen, Yi-Chun ;
Lien, Hui-Pang ;
Tzeng, Gwo-Hshiung .
EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (02) :926-938
[9]  
Chiu YJ., 2006, International journal of management and decision making, V7, P143, DOI [10.1504/ijmdm.2006.009140, DOI 10.1504/IJMDM.2006.009140, 10.1504/IJMDM.2006.009140]
[10]   Vendor selection in a modified re-buy situation using a strategy-aligned fuzzy approach [J].
Chou, S.-Y. ;
Shen, C.-Y. ;
Chang, Y.-H. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (14) :3113-3133