A study of influential factors of Enterprise Risk identification abilities based on AHP

被引:0
|
作者
Peng Zhengyin [1 ]
Cui Zhaoli [1 ]
机构
[1] Tianjin Univ Finance & Econ, Bussiness Management, Tianjin 300222, Peoples R China
来源
CONTEMPORARY INNOVATION AND DEVELOPMENT IN STATISTICAL SCIENCE | 2012年
关键词
Risk identification capabilities; Influencing factors; AHP;
D O I
暂无
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
As competition intensifies, risk management has become an important part of business management, and risk identification is the premise of the risk management. Only timely and accurate identification of the risk, the enterprise can reduce the risk probability and the losses. This article studies the degrees of the influence of the factors that affect risk identification capabilities. It provides reference for enterprises to improve risk identification ability.
引用
收藏
页码:210 / 215
页数:6
相关论文
共 50 条
  • [41] Evaluation of Knowledge Sharing Ability of Enterprise in Supply Chain Based on AHP and Entropy Method
    Li Hongxia
    Zhang Dawei
    PROCEEDINGS OF THE FOURTH INTERNATIONAL SYMPOSIUM - MANAGEMENT, INNOVATION & DEVELOPMENT, BK ONE & TWO, 2017, : 674 - 680
  • [42] The model of the business management decision of the whole employee stock ownership enterprise based on AHP
    He Yonggui
    Zhang Yu
    2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 2, PROCEEDINGS, 2009, : 110 - 113
  • [43] An Improved Risk Priority Number Method Based on AHP
    Zhao, Youhu
    Fu, Guicui
    Wan, Bo
    59TH ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS), 2013,
  • [44] Empirical Study on Risk Preference of Enterprise Managers
    Zhuang Ping
    Hou Hai-yan
    2014 INTERNATIONAL CONFERENCE ON MANAGEMENT OF E-COMMERCE AND E-GOVERNMENT (ICMECG), 2014, : 70 - 73
  • [45] Research on risk classification based on AHP in automobile insurance
    Liu Shidong
    Zheng Bin
    Li Teng
    Li Gengzhen
    Shen Pingyi
    2016 INTERNATIONAL CONFERENCE ON SMART GRID AND ELECTRICAL AUTOMATION (ICSGEA 2016), 2016, : 157 - 159
  • [46] Risk Assessment Model for Vehicle Traffic Based on AHP
    Yao, Lei-Yue
    Xie, Qiang-Lai
    2015 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, MSE 2015, 2015, : 374 - 379
  • [47] Risk Management of International Project Based on AHP and FMEA
    Zhong, Jia
    Lin, Zhiyu
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2665 - 2670
  • [48] Risk Assessment of Commercial Bank Loans Based on AHP
    Bin, Zhang
    PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, VOLS I AND II, 2010, : 1997 - 2001
  • [49] IDENTIFICATION AND EVALUATION OF THE CRITICAL SUCCESS FACTORS FOR CONSTRUCTION PROJECTS IN LITHUANIA: AHP APPROACH
    Gudiene, Neringa
    Banaitis, Audrius
    Podvezko, Valentinas
    Banaitiene, Nerija
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2014, 20 (03) : 350 - 359
  • [50] Identification of Risk Factors in Business Valuation
    Razali, Muhammad Najib
    Jalil, Rohaya Abdul
    Achu, Kamalahasan
    Ali, Hishamuddin Mohd
    JOURNAL OF RISK AND FINANCIAL MANAGEMENT, 2022, 15 (07)