共 50 条
[43]
THE QUALITY OF INSTALLATION WELDING CONTROLLED WITH COMBINED PRELIMINARY AND ACCEPTANCE STATISTICAL CONTROLS
[J].
AUTOMATIC WELDING USSR,
1981, 34 (02)
:23-25
[45]
UNDERGROUND STORAGE TANK INSTALLATION PRACTICES: CURRENT PROBLEMS, FUTURE CONTROLS.
[J].
Hazardous Substances,
1986, 1 (11)
:4-7
[48]
CONTRACT-ADMINISTRATION MANUAL FOR THE DESIGN PROFESSIONS - HOW TO ESTABLISH, SYSTEMATIZE, AND MONITOR CONSTRUCTION CONTRACT CONTROLS - CUTHBERTSON,AN, KENNEDY,DE
[J].
LIGHTING DESIGN & APPLICATION,
1983, 13 (05)
:52-52
[49]
CONTRACT-ADMINISTRATION MANUAL FOR THE DESIGN PROFESSIONS - HOW TO ESTABLISH, SYSTEMATIZE, AND MONITOR CONSTRUCTION CONTRACT CONTROLS - CULBERTSON,AN, KENNEY,DE
[J].
ENGINEERING NEWS-RECORD,
1984, 212 (20)
:154-154
[50]
The Mediating Effect of Formal Contractual Controls in the Relationship Between Experience and Contract Design
[J].
ACHIEVING SUCCESS AND INNOVATION IN GLOBAL SOURCING: PERSPECTIVES AND PRACTICES,
2015, 236
:52-61