Quantifying the effects of channel change on the discharge diversion of Jingjiang Three Outlets after the operation of the Three Gorges Dam

被引:16
作者
Li, Yanyan [1 ,2 ]
Yang, Guishan [1 ,2 ]
Li, Bing [1 ,2 ]
Wan, Rongrong [1 ,2 ]
Duan, Weili [1 ,2 ]
He, Zheng [1 ,2 ]
机构
[1] Chinese Acad Sci, Nanjing Inst Geog & Limnol, State Key Lab Lake Sci & Environm, Nanjing 210008, Jiangsu, Peoples R China
[2] Chinese Acad Sci, Nanjing Inst Geog & Limnol, Key Lab Watershed Geog Sci, Nanjing 210008, Jiangsu, Peoples R China
来源
HYDROLOGY RESEARCH | 2016年 / 47卷
基金
中国国家自然科学基金;
关键词
channel change; discharge diversion; Jingjiang Three Outlets; rating curve; Three Gorges Dam; Yangtze River; YANGTZE-RIVER; ISHIKARI RIVER; FRESH-WATER; CHINA; LAKE; PROJECT; PRECIPITATION; CATCHMENT; IMPACTS; TRENDS;
D O I
10.2166/nh.2016.016
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
The Jingjiang Three Outlets (JTO) are the water-sediment connecting channels between the Yangtze River and the Dongting Lake. The discharge diversion of the JTO plays a dominant role in the flood control of the middle-lower Yangtze River, Dongting Lake evolution, and ecological environment. After the operation of the Three Gorges Dam(TGD), the river channels downstream experienced dramatic channel changes. To study the influences of the channel change on the discharge diversion, the authors analyzed the channel changes by water level-discharge rating curves and cross-sectional channel profiles in 1980-2014. Hence, changes in the water level with the same discharge and the decline of discharge diversion at the JTO were noted. Channel incision caused the water level with the same discharge to greatly decrease in the upper Jingjiang River. The water level with the same discharge significantly increased at the JTO as a result of the channel deposition. The channel changes contributed approximately 37.74% and 76.36%, respectively, to the amount and ratio of discharge diversion decreases after the TGD operation. The channel changes serve as the primary factor in facilitating the decrease in the discharge diversion ratio, but not the main factor for the decreased amount of the discharge diversion.
引用
收藏
页码:161 / 174
页数:14
相关论文
共 50 条
  • [21] Simulation of open- and closed-end border irrigation systems using SIRMOD
    Khasraghi, Maryam Mahdizadeh
    Sefidkouhi, Mohammad Ali Gholami
    Valipour, Mohammad
    [J]. ARCHIVES OF AGRONOMY AND SOIL SCIENCE, 2015, 61 (07) : 929 - 941
  • [22] Rating curves and estimation of average water depth at the upper Negro River based on satellite altimeter data and modeled discharges
    Leon, J. G.
    Calmant, S.
    Seyler, F.
    Bonnet, M. -P.
    Cauhope, M.
    Frappart, F.
    Filizola, N.
    Fraizy, P.
    [J]. JOURNAL OF HYDROLOGY, 2006, 328 (3-4) : 481 - 496
  • [23] Impacts of the Gezhouba and Three Gorges reservoirs on the sediment regime in the Yangtze River, China
    Li, Qiongfang
    Yu, Meixiu
    Lu, Guobin
    Cai, Tao
    Bai, Xue
    Xia, Ziqiang
    [J]. JOURNAL OF HYDROLOGY, 2011, 403 (3-4) : 224 - 233
  • [24] [刘卡波 Liu Kabo], 2011, [水力发电学报, Journal of Hydroelectric Engineering], V30, P16
  • [25] Lu J.Y., 2011, ENG SCI, V9, P113
  • [26] Lu J. Y., 2012, RESPONSE PROCESS DOW
  • [27] NONPARAMETRIC TESTS AGAINST TREND
    Mann, Henry B.
    [J]. ECONOMETRICA, 1945, 13 (03) : 245 - 259
  • [28] Impact of the Three-Gorges Dam and water transfer project on Changjiang floods
    Nakayama, Tadanobu
    Shankman, David
    [J]. GLOBAL AND PLANETARY CHANGE, 2013, 100 : 38 - 50
  • [29] Experimental assessment of the stage-discharge relationship of the Heyn siphons of Bric Zerbino dam
    Petaccia, G.
    Fenocchi, A.
    [J]. FLOW MEASUREMENT AND INSTRUMENTATION, 2015, 41 : 36 - 40
  • [30] Pettitt A. N., 1979, Applied Statistics, V28, P126, DOI 10.2307/2346729