Crude Oil Displacement Efficiency of Produced Gas Re-injection

被引:16
作者
Chen, H. [1 ]
Yang, S. L. [1 ]
Ren, S. S. [2 ]
Yu, D. H. [1 ]
Lu, H. [1 ]
Li, F. F. [1 ]
Zhang, X. [1 ]
机构
[1] China Univ Petr, Minist Educ, Key Lab Petr Engn, Beijing 102249, Peoples R China
[2] Res Inst Oil Prod Jiangsu Oilfield, Yangzhou, Peoples R China
关键词
Gas re-injection; Displacement efficiency; Displacement pressure; CO2; content; MMP; Slim tube test; MINIMUM MISCIBILITY PRESSURE; CO2; CAPTURE; TURBINE CYCLE; OPTIMIZATION; EMISSION;
D O I
10.1080/15435075.2011.654149
中图分类号
O414.1 [热力学];
学科分类号
摘要
CO2 flooding process has been a proven valuable tertiary enhanced oil recovery (EOR) technique. Meanwhile, it can also store greenhouse gas like CO2. However, in the late period of CO2 flooding process, mixed gases containing CO2 and hydrocarbon gases would be produced along with the production of crude oil. Usually, these mixed gases would be separated by gas processing plant. To prevent greenhouse effect, CO2 is re-injected to the reservoir while hydrocarbon gas is sold in the market. But the separation process is very costly. In this article, the feasibility of the produced gas re-injection without separation was investigated by experiment. Based on the produced oil and gas of Jilin oilfield, slim tube tests were conducted to study displacement efficiency of the crude oil by CO2 re-injection. In addition, components of the produced oil were analyzed according to the color and production stages. Finally, factors like displacement pressure and CO2 content were studied. It was found that produced gas re-injection without separation is a feasible method to save time and cost.
引用
收藏
页码:566 / 573
页数:8
相关论文
共 25 条
[1]  
Baljit S. S., 2001, PAPER PRESENTED AT T
[2]  
Benmekki E. H., 1998, SPE RESERVOIR ENGINE, V5, P559
[3]  
Davison RJ, 1999, J CAN PETROL TECHNOL, V38, P45
[4]   CO2 capture with membrane contactors [J].
Falk-Pedersen, O ;
Gronvold, MS ;
Nokleby, P ;
Bjerve, F ;
Svendsen, HF .
INTERNATIONAL JOURNAL OF GREEN ENERGY, 2005, 2 (02) :157-165
[5]  
Forooghi A., 2009, PAPER PRESENTED AT T
[6]  
Grigg R. B., 1997, PAPER PRESENTED AT T
[7]   Techno-economic study of CO2 capture from an existing cement plant using MEA scrubbing [J].
Hassan, S. M. Nazmul ;
Douglas, Peter L. ;
Croiset, Eric .
INTERNATIONAL JOURNAL OF GREEN ENERGY, 2007, 4 (02) :197-220
[8]   What future for carbon capture and sequestration? [J].
Herzog, H .
ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2001, 35 (07) :148A-153A
[9]   Integration of Evaporative Gas Turbine with Oxy-Fuel Combustion for Carbon Dioxide Capture [J].
Hu, Y. ;
Li, H. ;
Yan, J. .
INTERNATIONAL JOURNAL OF GREEN ENERGY, 2010, 7 (06) :615-631
[10]   Control issues in the design of a gas turbine cycle for CO2 capture [J].
Imsland, L ;
Snarheim, D ;
Foss, BA ;
Ulfsnes, R ;
Bolland, O .
INTERNATIONAL JOURNAL OF GREEN ENERGY, 2005, 2 (02) :217-231