DEVELOPING A PROJECT PORTFOLIO SELECTION MODEL FOR CONTRACTOR FIRMS CONSIDERING THE RISK FACTOR

被引:24
作者
Abbasianjahromi, Hamidreza [1 ]
Rajaie, Hossein [1 ]
机构
[1] Amirkabir Univ Technol, Dept Construct Engn & Management, Tehran 15914, Iran
关键词
risk; project selection; portfolio; MCDM problems; Fuzzy set theory; FUZZY APPROACH; MANAGEMENT;
D O I
10.3846/13923730.2012.734856
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Regarding to the high importance of project selection in the project life cycle, solving bid/no-bid problems, especially in the construction industry, is a subject of most recent research. Portfolio selection has been the most interesting area in the last two decades in management research but there is poor investigation in the construction industry. Taking into account the risk, which is inherent in the construction industry and especially in the project selection phase is inevitable. This paper intends to propose a model for project selection and developing two main concepts including company portfolio and risk. The main innovation of this paper is presenting a new framework, which attempts to optimize project selection based on the endurable risk level of a company with regard to the existing portfolio. Considering the user-friendly characteristic of the model, this paper has applied the fuzzy multi criteria decision-making approaches. Finally, the model is implemented in a real case study.
引用
收藏
页码:879 / 889
页数:11
相关论文
共 43 条
[1]  
AHMED SM, 2002, J CONSTRUCTION ENG C, V17, P4
[2]  
[Anonymous], 2005, World J. Eng., DOI DOI 10.1109/TFUZZ.1993.390281
[3]  
Archer NP, 1998, INT J TECHNOL MANAGE, V16, P105
[4]   RATING AND RANKING OF MULTIPLE-ASPECT ALTERNATIVES USING FUZZY SETS [J].
BAAS, SM ;
KWAKERNAAK, H .
AUTOMATICA, 1977, 13 (01) :47-58
[5]   Techniques for the analysis of risks in major projects [J].
Baker, S ;
Ponniah, D ;
Smith, S .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (06) :567-572
[6]  
Baloi D., 2003, International Journal of Project Management, V21, P261, DOI 10.1016/S0263-7863(02)00017-0
[7]  
Bector C. R., 2002, P ANN C ADM SCI ASS, P95
[8]  
Bonissone P.P., 1982, APPROXIMATE REASONIN, P329
[9]   A fuzzy approach to R&D project portfolio selection [J].
Carlsson, Christer ;
Fuller, Robert ;
Heikkila, Markku ;
Majlender, Peter .
INTERNATIONAL JOURNAL OF APPROXIMATE REASONING, 2007, 44 (02) :93-105
[10]   A fuzzy approach to construction project risk assessment and analysis: construction project risk management system [J].
Carr, V ;
Tah, JHM .
ADVANCES IN ENGINEERING SOFTWARE, 2001, 32 (10-11) :847-857