A MULTI-OBJECTIVE MODEL FOR TIME-COST-QUALITY-RISK TRADE-OFF PROBLEMS IN PROJECT MANAGEMENT

被引:0
作者
Avsar, Melis Mine Sener [1 ]
Onut, Semih [1 ]
机构
[1] Yildiz Tech Univ, Dept Ind Engn, Istanbul, Turkey
来源
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE | 2022年 / 29卷 / 06期
关键词
Multi-Objective Model; Trade-Off; Weighted Goal Programming; Analytic Hierarchy Process; 3T Risk Assessment; PARTICLE SWARM OPTIMIZATION; CRITICAL-PATH;
D O I
10.23055/ijietap.2022.29.6.5785
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study presents a weighted four-dimensional time-cost-quality-risk trade-off problem to assist decision-makers in planning the best possible use of resources. The proposed model aims to minimize time and cost while maximizing quality and safety and to ensure that the project is completed as required. The critical path method was used to calculate the completion time, the analytical hierarchy process method was used to determine the weights of the quality parameters, and the 3T risk assessment method was used to calculate the risk values. The algorithm was coded in GAMS and optimized using CPLEX. A construction project with a deadline of 310 days, a budget of 5,250,000 (sic), 88% quality and a safety index (SI) of 77% was selected to analyze the accuracy of the model. The model achieved a solution with a completion time of 310 days, costs amounting to 5,247,775 (sic), 88.036% quality, and 77.338% SI.
引用
收藏
页码:826 / 838
页数:13
相关论文
共 51 条
[1]  
Afhsar A., 2007, ASIAN J CIVIL ENG, V8, P113
[2]   Pareto Front Particle Swarm Optimizer for Discrete Time-Cost Trade-Off Problem [J].
Aminbakhsh, Saman ;
Sonmez, Rifat .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2017, 31 (01)
[3]   Discrete particle swarm optimization method for the large-scale discrete time-cost trade-off problem [J].
Aminbakhsh, Saman ;
Sonmez, Rifat .
EXPERT SYSTEMS WITH APPLICATIONS, 2016, 51 :177-185
[4]   Application of fuzzy multi-attribute decision making in determining the critical path by using time, cost, risk, and quality criteria [J].
Amiri, Maghsoud ;
Golozari, Farhaneh .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 54 (1-4) :393-401
[5]  
[Anonymous], 2008, A Guide to the Project Management Body of Knowledge (PMBOK Guide), V4th
[6]  
Aziz N F., 2016, ARPN Journal of Engineering and Applied Sciences, V11, P7217, DOI DOI 10.1109/TIE.2013.2297315
[7]   Project management with time, cost, and quality considerations [J].
Babu, AJG ;
Suresh, N .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 88 (02) :320-327
[8]  
Bukhsh Z., 2017, VALUE STRUCTURAL HLT
[9]   NONLINEAR TIME COST TRADEOFF MODELS IN PROJECT-MANAGEMENT [J].
DECKRO, RF ;
HEBERT, JE ;
VERDINI, WA ;
GRIMSRUD, PH ;
VENKATESHWAR, S .
COMPUTERS & INDUSTRIAL ENGINEERING, 1995, 28 (02) :219-229
[10]   Hybrid multiple objective artificial bee colony with differential evolution for the time-cost-quality tradeoff problem [J].
Duc-Hoc Tran ;
Cheng, Min-Yuan ;
Minh-Tu Cao .
KNOWLEDGE-BASED SYSTEMS, 2015, 74 :176-186