Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints

被引:45
作者
Dalfard, Vahid Majazi [2 ]
Mohammadi, Ghorbanali [1 ]
机构
[1] Shahid Bahonar Univ, Dept Ind Engn, Kerman, Iran
[2] Islamic Azad Univ, Kerman Branch, Kerman, Iran
关键词
Scheduling; Parallel machine; Meta-heuristics; LINGO software; TIME;
D O I
10.1016/j.camwa.2012.04.007
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
There are different reasons, such as a preventive maintenance, for the lack of machines in the planning horizon in real industrial environments. This paper focuses on the multi-objective flexible job-shop scheduling problem with parallel machines and maintenance cost. A new mathematical modeling was developed for the problem. Two meta-heuristic algorithms, a hybrid genetic algorithm and a simulated annealing algorithm, were applied after modeling the problem. Then, solutions of these meta-heuristic methods were compared with solutions obtained by using the software LINGO for small-scale, medium-scale, and large-scale problems in terms of time and optimality. The results showed that the applied hybrid genetic and simulated annealing algorithms were much more effective than the solutions obtained using LINGO. Finally, solutions using the simulated annealing approach were compared with solutions of the hybrid genetic algorithm. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2111 / 2117
页数:7
相关论文
共 25 条
[1]   SINGLE-MACHINE FLOW-TIME SCHEDULING WITH A SINGLE BREAKDOWN [J].
ADIRI, I ;
BRUNO, J ;
FROSTIG, E ;
KAN, AHGR .
ACTA INFORMATICA, 1989, 26 (07) :679-685
[2]   Heuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times [J].
Allahverdi, Ali ;
Aydilek, Harun .
COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2010, 60 (05) :1374-1384
[3]  
Ashwani D., 2010, INT J ENG, V3, P510
[4]   Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time [J].
Aydilek, Harun ;
Allahverdi, Ali .
COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2010, 59 (02) :684-693
[5]   The disjunctive graph machine representation of the job shop scheduling problem [J].
Blazewicz, J ;
Pesch, E ;
Sterna, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 127 (02) :317-331
[6]  
Breit J., 2006, EUROPEAN J OPER RES, P1
[7]   Approximability of two-machine no-wait flowshop scheduling with availability constraints [J].
Cheng, TCE ;
Liu, ZH .
OPERATIONS RESEARCH LETTERS, 2003, 31 (04) :319-322
[9]  
Graves S., 1999, OPER RES, V29, P646
[10]   Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems [J].
Kacem, I ;
Hammadi, S ;
Borne, P .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS, 2002, 32 (01) :1-13