Avoiding clogging in constructed wetlands by using anaerobic digesters as pre-treatment

被引:72
作者
de la Varga, D. [1 ]
Diaz, M. A. [1 ]
Ruiz, I. [1 ]
Soto, M. [1 ]
机构
[1] Univ A Coruna, Dept Phys Chem & Chem Engn 1, La Coruna 15008, Galiza, Spain
关键词
Anaerobic digesters; Clogging; Constructed wetlands; Pre-treatment; HORIZONTAL SUBSURFACE FLOW; ACCUMULATION; SOLIDS; PERFORMANCE;
D O I
10.1016/j.ecoleng.2012.11.005
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
The main operational problem of subsurface flow constructed wetlands (CWs) is clogging of granular medium, a phenomenon related to the accumulation of different types of solids that lead to a reduction of the infiltration capacity of the gravel bed. It is generally accepted that the application of a good wastewater pre-treatment is essential for the long-term operation of subsurface flow CW. Anaerobic digesters (ADs) could help to the aim of clogging prevention. Two combined AD-CW treating either municipal or winery wastewater were designed and monitored for trough performance and efficiency parameters, solids accumulation and hydraulic conductivity, over a long term period. CW operated at high organic loading rates in terms of TCOD and BOD5 while suspended solids loading rates and solids accumulation in CW were lower. In turn, CW maintained an adequate hydraulic conductivity and low rates of solids accumulation. (c) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:262 / 269
页数:8
相关论文
共 24 条
  • [1] Anaerobic digesters as a pretreatment for constructed wetlands
    Alvarez, J. A.
    Ruiz, I.
    Soto, M.
    [J]. ECOLOGICAL ENGINEERING, 2008, 33 (01) : 54 - 67
  • [2] [Anonymous], 1995, STANDARD METHODS EXA
  • [3] Solids accumulation in six full-scale subsurface flow constructed wetlands
    Caselles-Osorio, Aracelly
    Puigayut, Jaume
    Segu, Emma
    Vaello, Nuria
    Granes, Francesc
    Garcia, David
    Garcia, Joan
    [J]. WATER RESEARCH, 2007, 41 (06) : 1388 - 1398
  • [4] Evaluation of constructed wetland treatment performance for winery wastewater
    Grismer, ME
    Carr, MA
    Shepherd, HL
    [J]. WATER ENVIRONMENT RESEARCH, 2003, 75 (05) : 412 - 421
  • [5] Clogging pattern in vertical-flow constructed wetlands: Insight from a laboratory study
    Hua, G. F.
    Zhu, W.
    Zhao, L. F.
    Huang, J. Y.
    [J]. JOURNAL OF HAZARDOUS MATERIALS, 2010, 180 (1-3) : 668 - 674
  • [6] Kadlec R., 2000, CONSTRUCTED WETLANDS
  • [7] Complementary methods to investigate the development of clogging within a horizontal sub-surface flow tertiary treatment wetland
    Knowles, P. R.
    Griffin, P.
    Davies, P. A.
    [J]. WATER RESEARCH, 2010, 44 (01) : 320 - 330
  • [8] Clogging in subsurface-flow treatment wetlands: Occurrence and contributing factors
    Knowles, Paul
    Dotro, Gabriela
    Nivala, Jaime
    Garcia, Joan
    [J]. ECOLOGICAL ENGINEERING, 2011, 37 (02) : 99 - 112
  • [9] Martin I., 2010, P 12 INT C WETL SYST, P618
  • [10] Masi F., 2002, IWA 8 INT C WETL SYS