Multitask and multistage production planning and scheduling for process industries

被引:27
作者
Gaglioppa, Francesco [1 ]
Miller, Lisa A. [2 ,3 ]
Benjaafar, Saif [3 ,4 ]
机构
[1] Univ Minnesota, Dept Mech Engn, Grad Program Ind & Syst Engn, Minneapolis, MN 55455 USA
[2] Target Corp, Minneapolis, MN USA
[3] Univ Minnesota, Ind & Syst Engn Div, Minneapolis, MN 55455 USA
[4] Univ Minnesota, Ctr Supply Chain Res, Minneapolis, MN 55455 USA
关键词
D O I
10.1287/opre.1080.0525
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider the planning and scheduling of production in a multitask/multistage batch manufacturing process typical of industries such as chemical manufacturing, food processing, and oil refining. We allow instances in which multiple sequences of tasks may be used to produce end products. We formulate the problem as a mixed-integer linear program and show that the linear programming relaxation has a large integrality gap and requires significant computational effort to solve to optimality for large instances. Using echelon inventory, we construct a new family of valid inequalities for this problem. The formulation with the additional constraints leads to a significantly tighter linear programming relaxation and to greatly reduced solution times for the mixed-integer linear program.
引用
收藏
页码:1010 / 1025
页数:16
相关论文
共 43 条
[1]   OPTIMAL LOT-SIZING ALGORITHMS FOR COMPLEX PRODUCT STRUCTURES [J].
AFENTAKIS, P ;
GAVISH, B .
OPERATIONS RESEARCH, 1986, 34 (02) :237-249
[2]   Issues in the use, design and evolution of process scheduling and planning systems [J].
Applequist, G ;
Samikoglu, O ;
Pekny, J ;
Reklaitis, G .
ISA TRANSACTIONS, 1997, 36 (02) :81-121
[3]   COMPUTATIONAL-COMPLEXITY OF UNCAPACITATED MULTI-ECHELON PRODUCTION PLANNING PROBLEMS [J].
ARKIN, E ;
JONEJA, D ;
ROUNDY, R .
OPERATIONS RESEARCH LETTERS, 1989, 8 (02) :61-66
[4]   A study of the lot-sizing polytope [J].
Atamürk, A ;
Muñoz, JC .
MATHEMATICAL PROGRAMMING, 2004, 99 (03) :443-465
[5]   STRONG FORMULATIONS FOR MULTI-ITEM CAPACITATED LOT SIZING [J].
BARANY, I ;
VANROY, TJ ;
WOLSEY, LA .
MANAGEMENT SCIENCE, 1984, 30 (10) :1255-1261
[6]   bc-prod:: A specialized branch-and-cut system for lot-sizing problems [J].
Belvaux, G ;
Wolsey, LA .
MANAGEMENT SCIENCE, 2000, 46 (05) :724-738
[7]   Modelling practical lot-sizing problems as mixed-integer programs [J].
Belvaux, G ;
Wolsey, LA .
MANAGEMENT SCIENCE, 2001, 47 (07) :993-1007
[8]   COMPUTATIONAL-COMPLEXITY OF THE CAPACITATED LOT SIZE PROBLEM [J].
BITRAN, GR ;
YANASSE, HH .
MANAGEMENT SCIENCE, 1982, 28 (10) :1174-1186
[9]   OPTIMAL POLICIES FOR A MULTI-ECHELON INVENTORY PROBLEM [J].
CLARK, AJ ;
SCARF, H .
MANAGEMENT SCIENCE, 1960, 6 (04) :475-490
[10]   A cutting plane approach to capacitated lot-sizing with start-up costs [J].
Constantino, M .
MATHEMATICAL PROGRAMMING, 1996, 75 (03) :353-376