Probabilistic loss assessment of a seismic retrofit technique for medium- and high-voltage transformer bushing systems in high seismicity regions

被引:5
作者
Brennan, Andrew L. [1 ]
Koliou, M. [1 ]
机构
[1] Texas A&M Univ, Zachry Dept Civil & Environm Engn, College Stn, TX 77843 USA
关键词
Earthquake-induced damage; expected annual losses; loss assessment; retrofit; stiffeners; transformer bushing systems; BUILDINGS;
D O I
10.1080/15732479.2020.1785513
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Transformer bushing systems have exhibited vulnerability during past earthquakes. Based on past qualification tests, it was found that the seismic performance of transformer bushing systems is improved when the bushings are mounted on a rigid base, as opposed to when mounted on more flexible cover plates of transformers. The addition of flexural stiffeners on the transformer cover plates has been proven to stiffen the base of the bushings and mitigate their seismic vulnerability. In this study, the Performance-Based Earthquake Engineering framework, introduced by the Pacific Earthquake Engineering Research (PEER) center, is used to evaluate in a probabilistic sense the earthquake-induced economic losses of transformer bushing systems both for as-installed and retrofitted mounting conditions. The results are presented in the form of expected losses conditioned on seismic intensity as well as expected annual losses for locations in Southern and Northern California. The results demonstrate the ability of the retrofit approach of adding flexural stiffeners on the transformer cover plates to reduce earthquake-induced economic losses compared to the as-installed conditions/design and further enhance community recovery in the occurrence of a strong seismic event.
引用
收藏
页码:1036 / 1045
页数:10
相关论文
共 37 条
[1]  
[Anonymous], 2009, FEMA P695
[2]   Seismic qualification of transformer high voltage bushings [J].
Bellorini, S ;
Salvetti, M ;
Bettinali, F ;
Zafferani, G .
IEEE TRANSACTIONS ON POWER DELIVERY, 1998, 13 (04) :1208-1213
[3]  
Brennan A.L, 2019, THESIS
[4]  
CSI, 2018, SAP 2000 ADV V19 2 0
[5]   Seismic response of transformer-bushing systems [J].
Ersoy, S ;
Saadeghvaziri, MA .
IEEE TRANSACTIONS ON POWER DELIVERY, 2004, 19 (01) :131-137
[6]  
Fahad M, 2013, THESIS
[7]  
FEMA, 2010, MULT LOSS EST METH
[8]   Seismic response of high voltage electrical transformer-bushing systems [J].
Filiatrault, A ;
Matt, H .
JOURNAL OF STRUCTURAL ENGINEERING, 2006, 132 (02) :287-295
[9]  
Gilani A., 1999, PEER
[10]  
Gilani A.S., 2001, EARTHQ SPECTRA, V17, P597, DOI [10.1193/1.1427316, DOI 10.1193/1.1427316]