Mechanical Analysis on Asphalt Mixture Overlaying on Old Cement Pavement Disengaged in the Corner

被引:0
作者
Yuan, Yuqing [1 ]
Wan, Haitao [1 ]
Wen, Sen [1 ]
Zhan, Wanli [1 ]
机构
[1] Henan Univ, Sch Civil Engn & Architecture, Kaifeng 475004, Henan, Peoples R China
来源
PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON ELECTRONIC & MECHANICAL ENGINEERING AND INFORMATION TECHNOLOGY (EMEIT-2012) | 2012年 / 23卷
关键词
road engineering; old cement concrete pavement; disengaging; asphalt mixture overlaying; finite element method;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Based on the theory of elastic layer system, calculation models of asphalt overlaying on old cement pavement structure were established. According to finite element software, in allusion to a hollow under a slab's edge or its corner, series of key factors to stress and deflection of asphalt overlay have been studied, which includes cooling rate, axle load, and cement concrete slab thickness. In light of the calculation results, the development rules of stress and displacement were summarized. The relations between asphalt overlay equivalent stress, maximum shear stress, deflection and the influence factors were obtained, respectively.
引用
收藏
页数:4
相关论文
共 9 条
[1]  
Guan Chang-sheng, 2006, Journal of Wuhan University of Technology (Information & Management Engineering), V28, P80
[2]  
Kong M., 2006, ULTIMATE BEARING CAP
[3]  
Li Y., 2008, RES VOID EVALUATION
[4]  
Miao L., 2007, FOREST ENG, V13, P53
[5]  
Tian X.G., 2010, HIGHWAY ENG, V35, P24
[6]  
Wang F., 2009, RES DETERMINATION ME
[7]  
Wang W., 2012, J CHINA FOREIGN HIGH, V32, P74
[8]  
Xie Q., 2008, J CHONGQING U, V31, P726
[9]  
Xue Zhong-jun, 2009, Journal of Harbin Institute of Technology, V41, P37