共 50 条
- [1] Seismic Analysis of Reinforced Concrete Rib Arch Bridge ADVANCES IN CIVIL ENGINEERING II, PTS 1-4, 2013, 256-259 : 1496 - +
- [4] Geometric nonlinear analysis of the rib-hoisting for long-span CFST arch bridge ADVANCES IN STRUCTURAL ENGINEERING:THEORY AND APPLICATIONS VOLS 1 AND 2, 2006, : 2058 - 2063
- [5] Study on Influencing Factors of CFST Arch Bridge Stability MATERIAL DESIGN, PROCESSING AND APPLICATIONS, PARTS 1-4, 2013, 690-693 : 900 - 904
- [7] Nonlinear stability analysis and completed bridge test on slanting type CFST arch bridges Jianzhu Jiegou Xuebao/Journal of Building Structures, 2015, 36 : 107 - 113
- [9] Simulation computation of arch-rib assembling based on cable adjustment for long span CFST arch bridge Advances in Structural Engineering:Theory and Applications Vols 1 and 2, 2006, : 2033 - 2037
- [10] Construction Control of Hoisting and Installation of Arch Rib of a Half-Through CFST Stiff Skeleton Arch Bridge 1600, Wuhan Bridge Research Institute (47):