Temporal boundary objects in megaprojects: Mapping the system with the Integrated Master Schedule

被引:33
作者
Chang, Artemis [1 ]
Hatcher, Caroline [1 ]
Kim, Jai [1 ]
机构
[1] Queensland Univ Technol, QUT Business Sch, Brisbane, Qld 4000, Australia
关键词
Timeline; Boundary object; Complex adaptive system; Sensemaking; COMPLEX ADAPTIVE SYSTEMS; COMPETENCE; LEADERSHIP; PROJECTS; TIME;
D O I
10.1016/j.ijproman.2012.08.007
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Recently, a stream of project management research has recognized the critical role of boundary objects in the organization of projects. In this paper, we investigate how one advanced scheduling tool, the Integrated Master Schedule (IMS), is used as a temporal boundary object at various stages of complex projects. The IMS is critical to megaprojects which typically span long periods of time and face a high degree of complexity and uncertainty. In this paper, we conceptualize projects of this type as complex adaptive systems (CAS). We report the findings of four case projects on how the IMS mapped interactions, interdependencies, constraints, and fractal patterns of these emerging projects, and how the process of IMS visualization enabled communication and negotiation of project realities. This paper highlights that this advanced timeline tool acts as a boundary object and elicits shared understanding of complex projects from their stakeholders. (C) 2012 Elsevier Ltd. APM and IPMA. All rights reserved.
引用
收藏
页码:323 / 332
页数:10
相关论文
共 38 条
[1]  
Adam B., 1995, TIMEWATCH SOCIAL ANA
[2]  
Alderman N., 2005, International Journal of Project Management, V23, P380, DOI 10.1016/j.ijproman.2005.01.004
[3]  
[Anonymous], DEP SCHED MARG INT M
[4]  
[Anonymous], INT J PROJECT MANAGE
[5]  
[Anonymous], SOC STUD SCI
[6]  
[Anonymous], SCHED GUID PROGR MAN
[7]  
[Anonymous], INT MAST PLAN INT MA
[8]  
[Anonymous], 30000 SINGL PRES SHE
[9]   Construction client multi-projects - A complex adaptive systems perspective [J].
Aritua, Bernard ;
Smith, Nigel J. ;
Bower, Denise .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (01) :72-79
[10]  
Bazeley P., 2007, Qualitative data analysis with NVivo