Accurate location of faults on power transmission lines with use of two-end unsynchronized measurements

被引:88
作者
Izykowski, J [1 ]
Molag, R
Rosolowski, E
Saha, MM
机构
[1] Wroclaw Univ Technol, PL-50370 Wroclaw, Poland
[2] Power Energy Concern EnergiaPro, PL-58300 Walbrzych, Poland
[3] ABB, SE-72159 Vasteras, Sweden
关键词
ATP-EMTP; fault location; simulation; transmission line; two-end unsynchronized phasor measurement;
D O I
10.1109/TPWRD.2005.858778
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents a new algorithm for locating faults on two-terminal power transmission lines. Unsynchronized two-end voltages and currents are processed for determining the sought distance to fault and the synchronization angle. The calculations are performed initially for the lumped model of a transmission line. Then, these results are used as the initial data for the Newton-Raphson method-based iterative calculations, in which the distributed parameter line model is utilized. The delivered fault location algorithm has been tested and evaluated with the fault data obtained from versatile ATP-EMTP simulations. The sample results of the evaluation are reported and discussed.
引用
收藏
页码:627 / 633
页数:7
相关论文
共 14 条
[1]   A PRACTICAL APPROACH TO ACCURATE FAULT LOCATION ON EXTRA-HIGH-VOLTAGE TEED FEEDERS [J].
AGGARWAL, RK ;
COURY, DV ;
JOHNS, AT ;
KALAM, A ;
NILSSON, SL .
IEEE TRANSACTIONS ON POWER DELIVERY, 1993, 8 (03) :874-883
[2]   Fault location on a transmission line using synchronized voltage measurements [J].
Brahma, SM ;
Girgis, AA .
IEEE TRANSACTIONS ON POWER DELIVERY, 2004, 19 (04) :1619-1622
[4]  
Crossley P., 1998, Proceedings of the 11th International Conference on Power System Protection. PSP'98, P1
[5]  
Dommel H. W., 1986, Electro-Magnetic Transients Program (EMTP) Theory Book
[6]   AN ACCURATE FAULT LOCATOR WITH COMPENSATION FOR APPARENT REACTANCE IN THE FAULT RESISTANCE RESULTING FROM REMOTE-END INFEED [J].
ERIKSSON, L ;
SAHA, MM ;
ROCKEFELLER, GD .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1985, 104 (02) :424-436
[7]   A NEW FAULT LOCATION TECHNIQUE FOR 2-TERMINAL AND 3-TERMINAL LINES [J].
GIRGIS, AA ;
HART, DG ;
PETERSON, WL .
IEEE TRANSACTIONS ON POWER DELIVERY, 1992, 7 (01) :98-107
[8]   ACCURATE FAULT LOCATION TECHNIQUE FOR POWER TRANSMISSION-LINES [J].
JOHNS, AT ;
JAMALI, S .
IEE PROCEEDINGS-C GENERATION TRANSMISSION AND DISTRIBUTION, 1990, 137 (06) :395-402
[9]   Automated transmission line fault analysis using synchronized sampling at two ends [J].
Kezunovic, M ;
Perunicie, B .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (01) :441-447
[10]   Unsynchronized two-terminal fault location estimation [J].
Novosel, D ;
Hart, DG ;
Udren, E ;
Garitty, J .
IEEE TRANSACTIONS ON POWER DELIVERY, 1996, 11 (01) :130-138