Priority Assessment of Online Monitoring Investment for Power System Circuit Breakers-Part I: Qualitative-Quantitative Approach

被引:32
作者
Razi-Kazemi, Ali Asghar [1 ,2 ,3 ]
Vakilian, Mehdi [1 ,2 ]
Niayesh, Kaveh [4 ]
Lehtonen, Matti [5 ]
机构
[1] Sharif Univ Technol, Ctr Excellence Power Syst Management & Control, IR-11365 Tehran, Iran
[2] Sharif Univ Technol, Dept Elect Engn, IR-11365 Tehran, Iran
[3] Aalto Univ, FIN-00076 Espoo, Finland
[4] Univ Tehran, Sch Elect & Comp Engn, IR-14395 Tehran, Iran
[5] Aalto Univ, Dept Elect Engn, FIN-00076 Helsinki, Finland
关键词
Circuit breaker (CB); condition-based maintenance (CBM); fuzzy sets theory; online monitoring (OLM); prioritization; reliability; ANALYTIC HIERARCHY PROCESS; MAINTENANCE; PRIORITIZATION; STRATEGY;
D O I
10.1109/TPWRD.2013.2243921
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Recognition of the circuit-breaker's (CB) vital role in reliable operation and protection of power systems (i.e., during energization, disconnecting loads, and clearing faults), helps to understand the requirement and importance of its maintenance management as well as maintenance scheduling. Condition-based maintenance (CBM), employing online monitoring (OLM) of CBs, has been long reported as the most practical maintenance policy on the power system CBs. There are a large number of CBs in a power system to be monitored; however, to address the financial limitations for OLM implementation (in utilities), a method will be proposed to find the most critical breakers for enforcing effectively the CBs CBM planning in this power system. This paper employs some qualitative and quantitative criteria to develop this method. While, the former criterion is deals with through assessing the condition of CBs through fuzzy sets theory. And the latter criterion is dealt with through the evaluation of CBs' influence on the overall system reliability (through introduced indices). This method is applied on a sample transmission substation with a breaker-and-a-half configuration. Numerical analysis of this simulation results demonstrates how this method can be employed to prioritize the CBs for OLM.
引用
收藏
页码:928 / 938
页数:11
相关论文
共 25 条
  • [1] Al-Suhaily Muhannad, 2010, 2010 International Conference on High Voltage Engineering and Application (ICHVE 2010), P626, DOI 10.1109/ICHVE.2010.5640781
  • [2] Optimal design of a condition-based maintenance model
    Amari, SV
    McLaughlin, L
    [J]. ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2004 PROCEEDINGS, 2004, : 528 - 533
  • [3] Anders G, 2011, SPRINGER SER RELIAB, P1, DOI 10.1007/978-0-85729-088-5
  • [4] Billinton R., RELIABILITY EVALUATI
  • [5] An assessment of RPN prioritization in a failure modes effects and criticality analysis
    Bowles, JB
    [J]. ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2003 PROCEEDINGS, 2003, : 380 - 386
  • [6] Quantitative Decision-Making Model for Distribution System Restoration
    Chen, Wen-Hui
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2010, 25 (01) : 313 - 321
  • [7] Selecting the Individual Numerical Scale and Prioritization Method in the Analytic Hierarchy Process: A 2-Tuple Fuzzy Linguistic Approach
    Dong, Yucheng
    Hong, Wei-Chiang
    Xu, Yinfeng
    Yu, Shui
    [J]. IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2011, 19 (01) : 13 - 25
  • [8] Component criticality importance measures for the power industry
    Espiritu, Jose F.
    Coit, David W.
    Prakash, Upyukt
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2007, 77 (5-6) : 407 - 420
  • [9] Galassi A, 2009, P EL DISTR C, P1
  • [10] Garzon RubenD., 2002, HIGH VOLTAGE CIRCUIT