Agent Based Restoration With Distributed Energy Storage Support in Smart Grids

被引:140
作者
Nguyen, Cuong P. [1 ]
Flueck, Alexander J. [2 ]
机构
[1] GE Energy, Schenectady, NY 12345 USA
[2] IIT, Dept Elect & Comp Engn, Chicago, IL 60616 USA
关键词
Active network management; advanced distribution automation; distributed energy storage; islanded operation; islanding coordination; multiagent systems; priority load restoration; smart grid; SERVICE RESTORATION; DISTRIBUTION-SYSTEM; EXPERT-SYSTEM; PART I;
D O I
10.1109/TSG.2012.2186833
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The goal of this paper is to present a new and completely distributed algorithm for service restoration with distributed energy storage support following fault detection, location, and isolation. The distributed algorithm makes use of intelligent agents, which possess three key characteristics, namely autonomy, local view, and decentralization. The switch agents will detect, locate and isolate the fault, then restore the load. The distributed energy storage agent will support the system in grid-connected as well as islanded operation. Important restoration issues such as load priority restoration and islanding coordination of multiple distributed energy storage systems will be discussed. Two case studies on the modified IEEE 34 node test feeder will be presented.
引用
收藏
页码:1029 / 1038
页数:10
相关论文
共 28 条
[1]   An AIS-ACO hybrid approach for multi-objective distribution system reconfiguration [J].
Ahuja, Ashish ;
Das, Sanjoy ;
Pahwa, Anil .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2007, 22 (03) :1101-1111
[2]  
[Anonymous], 2011, P IEEE POW EN SOC GE
[3]  
[Anonymous], GRID 2030 NATL VISIO
[4]  
[Anonymous], 2001, P IEEE POW ENG SOC W
[5]  
[Anonymous], 2002, FIPA COMMUNICATIVE A
[6]   Network reconfiguration for service restoration in shipboard power distribution systems [J].
Butler, KL ;
Sarma, NDR ;
Prasad, VR .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (04) :653-661
[7]  
Flueck A.J., 2010, IEEE Power Energy Society General Meeting, P1, DOI DOI 10.1109/PES.2010.5589520
[8]   Destination: Perfection [J].
Flueck, Alexander ;
Li, Zuyi .
IEEE POWER & ENERGY MAGAZINE, 2008, 6 (06) :36-47
[9]   DISTRIBUTION-SYSTEM SERVICE RESTORATION USING THE ARTIFICIAL NEURAL-NETWORK APPROACH AND PATTERN-RECOGNITION METHOD [J].
HSU, YY ;
HUANG, HM .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 1995, 142 (03) :251-256
[10]  
Jones A., 2009, S C ELECT MAY, P1