Models for MMSP-W considering workstation dependencies: A case study of Nissan's Barcelona plant

被引:8
作者
Bautista, Joaquin [1 ]
Cano, Alberto [1 ]
Alfaro, Rocio [1 ]
机构
[1] Univ Politecn Cataluna, ETSEIB EPSEB, E-08028 Barcelona, Spain
关键词
Manufacturing; Sequencing; Work overload; Linear programming; Mixed-model system; ASSEMBLY-LINE; SEQUENCING PROBLEM; WORK OVERLOAD; MINIMIZE; TIME; ALGORITHMS; USAGE; RISK; JOB;
D O I
10.1016/j.ejor.2012.07.006
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this article, we present two formulations and their unification for the Mixed-Model Sequencing Problem with Workload Minimisation (MMSP-W) for production lines with serial workstations and parallel homogeneous processors. The models were executed in Solver CPLEX, with reference instances and with a case study of Nissan's Powertrain plant in Barcelona. Different situations were analysed to evaluate investments in projects designed to improve process and product design and reduce work overloads in the line at short-, intermediate- and long-term intervals. (C) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:669 / 679
页数:11
相关论文
共 30 条