A new approach for the multi-site resource-constrained project scheduling problem

被引:8
作者
Stiti, Cyrine [1 ]
Driss, Olfa Belkahla [2 ]
机构
[1] Univ Tunis, Inst Super Gest Tunis, Tunis, Tunisia
[2] Univ Manouba, Ecole Super Commerce Tunis, Manouba, Tunisia
来源
CENTERIS2019--INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS/PROJMAN2019--INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT/HCIST2019--INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES | 2019年 / 164卷
关键词
Multi-site; RCPSP; Scheduling; Transfer-time; PSO; Swarm Intelligence; metaheuristic; Factory; 4.0; PARTICLE SWARM OPTIMIZATION; MODEL;
D O I
10.1016/j.procs.2019.12.209
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In recent years, the study of Resource Constrained Project Scheduling Problem RCPSP which as a well-known NP-hard problem in project management and operational research is taking substantial interest. The present work investigates a new RCPSP extension in multi-site environments with resource pooling between different sites. This extension considers two types of resources: fixed and mobile resources. New constraints are taken into account like transfer times of mobile resources and the decision on which site a task is carried out. We propose a new Particle Swarm Optimization-based solution to deal with this RCPSP variant aiming at minimizing the total project Makespan. The proposed algorithm uses a Valid Particle Generator to produce feasible schedules. As well, inertia weight is adaptively tuned to realize a trade-off between diversification and intensification. Our solution has been tested on a set of newly created benchmarks to reveal very promising results. (C) 2019 The Authors. Published by Elsevier B.V. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/) Peer-review under responsibility of the scientific committee of the CENTERIS -International Conference on ENTERprise Information Systems / ProjMAN - International Conference on Project MANagement / HCist - International Conference on Health and Social Care Information Systems and Technologies.
引用
收藏
页码:478 / 484
页数:7
相关论文
共 16 条
[1]   SCHEDULING SUBJECT TO RESOURCE CONSTRAINTS - CLASSIFICATION AND COMPLEXITY [J].
BLAZEWICZ, J ;
LENSTRA, JK ;
KAN, AHGR .
DISCRETE APPLIED MATHEMATICS, 1983, 5 (01) :11-24
[2]  
Blum Christian, 2008, P43, DOI 10.1007/978-3-540-74089-6_2
[3]   An Efficient Particle Swarm Optimizer with Application to Man-Day Project Scheduling Problems [J].
Chen, Ruey-Maw ;
Sandnes, Frode Eika .
MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
[4]  
Chunfeng Liu, 2011, Journal of Computers, V6, P2365, DOI 10.4304/jcp.6.11.2365-2375
[5]  
Engelbrecht A.P., 2006, Fundamentals of Computational Swarm Intelligence
[6]   ACTIVITIES PLANNING AND RESOURCES ASSIGNMENT ON DISTINCT PLACES: A MATHEMATICAL MODEL [J].
Gourgand, Michel ;
Grangeon, Nathalie ;
Klement, Nathalie .
RAIRO-OPERATIONS RESEARCH, 2015, 49 (01) :79-98
[7]   Particle swarm optimization for resource-constrained project scheduling [J].
Department of Building and Construction, City University of Hong Kong, Tat Avenue, Kowloon, Hong Kong ;
不详 .
Int. J. Proj. Manage., 2006, 1 (83-92) :83-92
[8]   An improved particle swarm optimization for the resource-constrained project scheduling problem [J].
Jia, Qiong ;
Seo, Yoonho .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 67 (9-12) :2627-2638
[9]  
Kennedy J, 1995, 1995 IEEE INTERNATIONAL CONFERENCE ON NEURAL NETWORKS PROCEEDINGS, VOLS 1-6, P1942, DOI 10.1109/icnn.1995.488968
[10]   A Modified PSO Algorithm for Minimizing the Total Costs of Resources in MRCPSP [J].
Khalilzadeh, Mohammad ;
Kianfar, Fereydoon ;
Chaleshtari, Ali Shirzadeh ;
Shadrokh, Shahram ;
Ranjbar, Mohammad .
MATHEMATICAL PROBLEMS IN ENGINEERING, 2012, 2012