Bi-objective Modeling Approach for Repairing Multiple Feature Infrastructure Systems

被引:17
作者
Sousa, Nuno [1 ,2 ]
Alcada-Almeida, Luis [2 ,3 ]
Coutinho-Rodrigues, Joao [2 ,4 ]
机构
[1] Univ Aberta, Dept Sci & Technol, Lisbon, Portugal
[2] INESC Coimbra, Coimbra, Portugal
[3] Univ Coimbra, Fac Econ, Coimbra, Portugal
[4] Univ Coimbra, Fac Sci & Technol, Dept Civil Engn, Coimbra, Portugal
关键词
OPTIMAL REPAIR/REPLACEMENT POLICY; COST OPTIMIZATION; STEEL STRUCTURES; OPTIMAL MAINTENANCE; INFORMATION MODEL; MANAGEMENT-SYSTEM; ASSET MANAGEMENT; GENERAL REPAIRS; NETWORK DESIGN; RESTORATION;
D O I
10.1111/mice.12245
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
A bi-objective decision aid model for planning long-term maintenance of infrastructure systems is presented, oriented to interventions on their constituent elements, with two upgrade levels possible for each element (partial/full repairs). The model aims at maximizing benefits and minimizing costs, and its novelty is taking into consideration, and combining, the system/element structure, volume discounts, and socioeconomic factors. The model is tested with field data from 229 sidewalks (systems) and compared to two simpler repair policies, of allowing only partial or full repairs. Results show that the efficiency gains are greater in the lower mid-range budget region. The proposed modeling approach is an innovative tool to optimize cost/benefits for the various repair options and analyze the respective trade-offs.
引用
收藏
页码:213 / 226
页数:14
相关论文
共 41 条
[1]   Object-oriented blackboard models for integrated design of steel structures [J].
Adeli, H ;
Kao, WM .
COMPUTERS & STRUCTURES, 1996, 61 (03) :545-561
[2]   AN INTEGRATED COMPUTING ENVIRONMENT FOR SOLUTION OF COMPLEX ENGINEERING PROBLEMS USING THE OBJECT-ORIENTED PROGRAMMING PARADIGM AND A BLACKBOARD ARCHITECTURE [J].
ADELI, H ;
YU, G .
COMPUTERS & STRUCTURES, 1995, 54 (02) :255-265
[3]   Regularization neural network for construction cost estimation [J].
Adeli, H ;
Wu, MY .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1998, 124 (01) :18-24
[4]  
Adeli H., 2006, COST OPTIMIZATION ST
[5]  
[Anonymous], 2000, HIGHWAY CAPACITY MAN
[6]  
[Anonymous], 2005, MULTICRITERIA OPTIMI
[7]   A web-centric information model for managing road infrastructure data [J].
Capuruço, RAC ;
Tighe, SL .
COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2006, 21 (05) :357-368
[8]   DESIGN-INDEPENDENT CAD WINDOW SYSTEM USING THE OBJECT-ORIENTED PARADIGM AND HP-X WIDGET ENVIRONMENT [J].
CHUANG, LC ;
ADELI, H .
COMPUTERS & STRUCTURES, 1993, 48 (03) :433-440
[9]  
Cohon J.L., 1978, Multiobjective programming and planning
[10]   A bi-objective modeling approach applied to an urban semi-desirable facility location problem [J].
Coutinho-Rodrigues, Joao ;
Tralhao, Lino ;
Alcada-Almeida, Luis .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 223 (01) :203-213