Identifying the critical factors affecting schedule performance of public housing projects

被引:87
作者
Hwang, Bon-Gang [1 ]
Zhao, Xianbo [1 ]
Ng, Si Yi [2 ]
机构
[1] Natl Univ Singapore, Dept Bldg, Singapore 117566, Singapore
[2] Far East Org, Retails Operat Dept, Singapore 228213, Singapore
关键词
Public housing; Building; Schedule; Singapore; CONSTRUCTION DELAYS;
D O I
10.1016/j.habitatint.2012.06.008
中图分类号
F0 [经济学]; F1 [世界各国经济概况、经济史、经济地理]; C [社会科学总论];
学科分类号
0201 ; 020105 ; 03 ; 0303 ;
摘要
With the increasing demand for public housing, the Singapore government decided to reduce the waiting time of future public housing owners, which requires these projects to be completed on time. As a result, this study aims to identify the critical factors affecting schedule performance of public housing projects in Singapore, compare the factors affecting schedule performance of public housing projects and other building projects in Singapore, and provide recommendations to respond to these factors. The survey conducted with 36 industry experts revealed that "site management", "coordination among various parties", and "availability of laborers on site" were the top three factors affecting schedule performance of public housing projects performed in Singapore. In addition, the results of the Spearman rank correlation coefficient implied that there was statistically significant agreement on the ranks of the player-related factors between HDB and other building projects. Furthermore, based on the interviews conducted with experienced practitioners, recommendations to deal with these factors are proposed. The findings from this study will help practitioners involving public housing projects to take measures to assure the achievement of project schedule objectives. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:214 / 221
页数:8
相关论文
共 36 条
[1]  
Abdul KadirM.R., 2005, STRUCT SURV, V23, P42
[2]   Construction delays and their causative factors in Nigeria [J].
Aibinu, Ajibade Ayodeji ;
Odeyinka, Henry Agboola .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (07) :667-677
[3]  
Al-Khalil MohammedI., 1999, Construction Management and Economics, V17, P647, DOI DOI 10.1080/014461999371259
[4]  
Arditi D., 1985, J CONSTR MANAGE EC, V3, P171, DOI [DOI 10.1080/01446198500000013, 10.1080/01446198500000013]
[5]   Causes of delay in large construction projects [J].
Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia .
Int. J. Proj. Manage., 2006, 4 (349-357) :349-357
[6]  
BCA, 2012, PUBL SECT PROJ SUST
[7]  
Chan D. W. M., 1997, International Journal of Project Management, V15, P55, DOI 10.1016/S0263-7863(96)00039-7
[8]   A study of the factors affecting construction durations in Hong Kong [J].
Chan, Daniel W. M. ;
Kumaraswamy, Mohan M. .
Construction Management and Economics, 1995, 13 (04) :319-333
[9]  
Chan D.W.M., 2002, International Journal of Project Management, V20, P23, DOI DOI 10.1016/S0263-7863(00)00032-6
[10]   Critical success factors for different project objectives [J].
Chua, DKH ;
Kog, YC ;
Loh, PK .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (03) :142-150