A proposed approach for setup time reduction through integrating conventional SMED method with multiple criteria decision-making techniques

被引:41
作者
Almomani, Mohammed Ali [1 ]
Aladeemy, Mohammed [2 ]
Abdelhadi, Abdelhakim [3 ]
Mumani, Ahmad [1 ]
机构
[1] Jordan Univ Sci & Technol, Dept Ind Engn, Irbid 22110, Jordan
[2] Jordan Univ Sci & Technol, Dept Mech Engn, Irbid 22110, Jordan
[3] King Khalid Univ, Dept Ind Engn, Abha 61411, Saudi Arabia
关键词
Setup reduction; SMED; MCDM; Productivity improvement; Lean; LEAN TOOLS; SELECTION; TOPSIS; AHP; FLOW;
D O I
10.1016/j.cie.2013.07.011
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Short setup time is an essential element for the effective implementation of many lean pillars, i.e., JIT, and Kanban. Most of the current setup reduction methodologies are based on Shingo's Single Minute Exchange of Dies (SMED) that suggests the conversion of internal setup operations to external operations. However, the conventional SMED approach - as proposed by Shingo - does not possess a systematic approach to accomplish this conversion. Thus, a new approach is proposed in order to aid the process engineers in implementing SMED. The proposed approach is based on the conventional SMED, but also it incorporates Multiple Criteria Decision-Making Techniques (MCDM) to the third implementation phase. The MCDM techniques used in this work are Analytical Hierarchal Process (AHP), Preference Selection Index (PSI) and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS). The proposed approach provides a systematic procedure for selecting the best setup technique among the available alternatives, and takes also into consideration other factors that affect the decision-making process; including: cost, energy, facility layout, safety, life, quality and maintenance. A real example of PVC industry is used to exemplify the approach. The results demonstrate the capability of the proposed approach in setup time reduction, which in turn will improve machines' utilization, and increase the productivity and flexibility of the whole facility. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:461 / 469
页数:9
相关论文
共 45 条
[1]  
Abraham A., 2012, SASTECH Journal, V11, P47
[2]  
Al-Hawari T, 2011, JORDAN J MECH IND EN, V5, P451
[3]   The significance of reducing setup times/setup costs [J].
Allahverdi, Ali ;
Soroush, H. M. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :978-984
[4]  
Alves A.S., 2009, POMS 20 Annual Conference, P1
[5]   Criteria selection and analysis for single machine dynamic on-line scheduling with multiple objectives and sequence-dependent setups [J].
Ang, Adeline T. H. ;
Sivakumar, Appa Iyer ;
Qi, Chao .
COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (04) :1223-1231
[6]  
[Anonymous], P 6 ISAHP AUG 2 4 BE
[7]  
Attri R., 2013, J KING SAUD U ENG SC, DOI DOI 10.1016/JJKSUES.2013.06.003
[8]   TOPSIS for bi-level MODM problems [J].
Baky, Ibrahim A. ;
Abo-Sinna, Mahmoud A. .
APPLIED MATHEMATICAL MODELLING, 2013, 37 (03) :1004-1015
[9]   An application of AHP and sensitivity analysis for selecting the best slicing machine [J].
Chang, Che-Wei ;
Wu, Cheng-Ru ;
Lin, Chin-Tsai ;
Chen, Huang-Chu .
COMPUTERS & INDUSTRIAL ENGINEERING, 2007, 52 (02) :296-307
[10]   Scheduling with dependent setups and maintenance in a textile company [J].
Chen, W. J. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 57 (03) :867-873