共 10 条
[1]
Scheduling cost optimization and neural dynamics model for construction
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1997, 123 (04)
:450-458
[3]
Adeli H., 1998, Neurocomputing in Design Automation
[4]
Fowler M., 1997, ANAL PATTERNS REUSAB
[5]
Fowler M., 1997, UML DISTILLED APPLYI
[6]
Gamma E., 1995, Design Patterns: Elements of Reusable Object-Oriented Software, V206, P395
[7]
CONSCOM: An OO construction scheduling and change management system
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1999, 125 (05)
:368-376
[8]
ODENTHAL G, 1997, P 11 EUR C OBJ OR PR, P511