Real-time freight locomotive rescheduling and uncovered train detection during disruption

被引:24
作者
Sato, Keisuke [1 ]
Fukumura, Naoto [1 ]
机构
[1] Railway Tech Res Inst, Transport Informat Technol Div, Kokubunji, Tokyo 1858540, Japan
关键词
Transportation; Real-time locomotive rescheduling; Column generation; Set-covering relaxation; Constrained shortest path; SCHEDULE RECOVERY; DELAY MANAGEMENT; AIRCRAFT; VEHICLE; OPTIMIZATION; ALGORITHM; MODELS; SYSTEM;
D O I
10.1016/j.ejor.2012.04.025
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper discusses rescheduling of freight train locomotives when dealing with a disrupted situation in the daily operations in Japan. Within the current framework of dispatching processes, passenger railway operators modify the entire timetables and an adjusted freight train timetable is distributed to a freight train operator. For this timetable, we solve the locomotive rescheduling problem by changing the assignment of the locomotives to all the trains and considering their periodic inspections. We then solve the uncovered train detection problem that selects unassigned trains according to their value if the rescheduling phase fails. We formulate the two problems as integer programming problems and solve them by column generation. Our simple speeding-up technique named set-covering relaxation is applied to the rescheduling problem, which has set-partitioning constraints. The column generation subproblem is reduced to a shortest path problem with the inspection constraint and solved in polynomial time. Numerical experiments carried out with a real timetable, locomotive scheduling plan and major disruption data in the area with the highest frequency of freight trains reveal that satisfactory solutions are obtained within 30 second on a PC even for cases with a 72-hour goal for recovery. The set-covering relaxation speeds up the computation time by a factor of eight at a maximum. (c) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:636 / 648
页数:13
相关论文
共 50 条
  • [41] A Real-Time Disruption Prediction Tool for VDE on EAST
    Bao, N. N.
    Huang, Y.
    Xiao, B. J.
    Yuan, Q. P.
    Zhuang, H. D.
    Luo, Z. P.
    Wang, Y. H.
    Zhang, R. R.
    IEEE TRANSACTIONS ON PLASMA SCIENCE, 2020, 48 (03) : 715 - 720
  • [42] Real-time Trajectory Planning for Rail Transit Train Considering Regenerative Energy
    Qu, Jianwei
    Feng, Xiaoyun
    Wang, Qingyuan
    2014 IEEE 17TH INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION SYSTEMS (ITSC), 2014, : 2738 - 2742
  • [43] Risk of delay evaluation in real-time train scheduling with uncertain dwell times
    Meloni, Carlo
    Pranzo, Marco
    Sama, Marcella
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2021, 152
  • [44] An Advanced Real-Time Train Dispatching System for Minimizing the Propagation of Delays in a Dispatching Area Under Severe Disturbances
    D'Ariano, Andrea
    Pranzo, Marco
    NETWORKS & SPATIAL ECONOMICS, 2009, 9 (01) : 63 - 84
  • [45] An efficient greedy heuristic for the real-time train platforming problem
    Garcia-Rodenas, Ricardo
    Lopez-Garcia, Maria Luz
    Cadarso, Luis
    Codina, Esteve
    COMPUTERS & OPERATIONS RESEARCH, 2024, 164
  • [46] Real-time detection of track fasteners based on object detection and FPGA
    Xiao, Tian
    Xu, Tianhua
    Wang, Guang
    MICROPROCESSORS AND MICROSYSTEMS, 2023, 100
  • [47] A Novel Real-Time Algorithm for Optimizing Train Speed Profiles Under Complex Constraints
    Zhou, Hao
    Wan, Yiming
    Ye, Hao
    Li, Borui
    Liu, Baoming
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2023, 24 (08) : 7987 - 8002
  • [48] Efficient Real-Time Control Design for Automatic Train Regulation of Metro Loop Lines
    Li, Shukai
    Yang, Lixing
    Gao, Ziyou
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2019, 20 (02) : 485 - 496
  • [49] A Real-Time Burst Detection Method
    Ebina, Ryohei
    Nakamura, Kenji
    Oyanagi, Shigeru
    2011 23RD IEEE INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE (ICTAI 2011), 2011, : 1040 - 1046
  • [50] North American freight rail industry real-time optimized equipment distribution systems: State of the practice
    Gorman, Michael F.
    Crook, Kevin
    Sellers, David
    TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2011, 19 (01) : 103 - 114