Impact of Project Complexity Factors on Project Cycle Time: A System Dynamics Modelling Approach

被引:0
作者
Lebcir, Reda M. [1 ]
Choudrie, Jyoti [1 ]
机构
[1] Univ Hertfordshire, Sch Business, Hatfield AL10 9AB, Herts, England
来源
CONSTRUCTION AND PROJECT MANAGEMENT, ICCPM 2011 | 2011年 / 15卷
关键词
Project Management; Project Complexity; Project Uncertainty; Project Cycle Time; System Dynamics;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The aim of this paper if to investigate the factors driving project complexity in construction projects and how they impact on project cycle time. This issue has been addressed by building a framework for project complexity for construction projects and evaluating is impact on project cycle time through a: System Dynamics (SD) simulation model integrating project complexity, project operations, and its time performance The results indicate that project complexity is driven by four factors: Project Uncertainty, Infrastructure Newness, Infrastructure Interconnectivity, and Infrastructure Size and that Project Uncertainty is the most influential factor on project cycle time comparatively to the other factors
引用
收藏
页码:166 / 170
页数:5
相关论文
共 8 条
[1]  
[Anonymous], 2000, BUSINESS DYNAMICS SY
[2]  
[Anonymous], 2009, INT RES NETW PROJ MA
[3]  
Baccarini D., 1996, International Journal of Project Management, V14, P201, DOI 10.1016/0263-7863(95)00093-3
[5]   Sources and assessment of complexity in NPD projects [J].
Kim, J ;
Wilemon, D .
R & D MANAGEMENT, 2003, 33 (01) :15-30
[6]  
Lebcir R., 2006, FRAMEWORK PROJECT CO
[7]   One size does not fit all projects: Exploring classical contingency domains [J].
Shenhar, AJ .
MANAGEMENT SCIENCE, 2001, 47 (03) :394-414
[8]  
Williams T.M., 1999, International Journal of Project Management, V17, P269, DOI [10.1016/S0263-7863(98)00047-7, DOI 10.1016/S0263-7863(98)00047-7]