Project Management Knowledge and Effects on Construction Project Outcomes: An Empirical Study

被引:52
作者
Chou, Jui-Sheng [1 ]
Yang, Jung-Ghun [1 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Construct Engn, Taipei, Taiwan
关键词
PMBOK (R) Guide; perceived performance; customer satisfaction; project success; structural equation model; construction engineering; PERFORMANCE; TECHNOLOGY; SATISFACTION; SUCCESS; MODELS; INDEX;
D O I
10.1002/pmj.21293
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This study examines the relationships among the PMBOK (R) Guide, project performance, customer satisfaction, and project success by assessing the efficacy of management techniques, tools, and skills for implementing infrastructure and building construction. Experienced interviewees from private engineering firms and public agencies were asked to complete a questionnaire, and the responses were analyzed by means of a structural equation model. The analytical results indicate the appropriateness of prioritizing the practice of the PMBOK (R) Guide in the construction industry. This study contributes to the literature by providing insight into interactions among the PMBOK (R) Guide and construction project outcomes in engineering practices. Particularly, the bidder's conference and procurement negotiations are the priority techniques to minimize bidding and legal procurement problems. Moreover, the study recommends the use of stakeholder analysis, communication requirements analysis, and the communication methods to perform effective communication management. Although the conclusions are based on the sample collected in Taiwan, the research findings can be used by project managers and educators to tailor the PMBOK (R) Guide to their unique needs and to design effective training programs for construction specialists.
引用
收藏
页码:47 / 67
页数:21
相关论文
共 43 条
[31]  
Li-Ren Yang, 2006, International Journal of Project Management, V24, P96, DOI 10.1016/j.ijproman.2005.06.008
[32]   Models for Predicting Project Performance in China Using Project Management Practices Adopted by Foreign AEC Firms [J].
Ling, Florence Yean Yng ;
Low, Sui Pheng ;
Wang, ShouQing ;
Egbelakin, Temitope .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (12) :983-990
[33]   Determinants of international architectural, engineering, and construction firms' project success in China [J].
Ling, FYY ;
Ibbs, CW ;
Hoo, WY .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (02) :206-214
[34]  
Müller R, 2012, IEEE T ENG MANAGE, V59, P77, DOI 10.1109/TEM.2011.2114350
[35]   Project performance versus use of technologies at project and phase levels [J].
O'Connor, JT ;
Yang, LR .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (03) :322-329
[36]   Significance of project management performance assessment (PMPA) model [J].
Qureshi, Tahir Masood ;
Warraich, Aamir Shahzad ;
Hijazi, Syed Tahir .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (04) :378-388
[37]  
Scott J. E., 1994, 15 INT C INF SYST VA
[38]   Structural equation model for effective CRM of information infrastructure industry in Korea [J].
Shin, Sun Young ;
Moon, Tae Hee ;
Sohn, So Young .
EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (02) :1695-1705
[39]   User and developer common knowledge: Effect on the success of information system development projects [J].
Tesch, Debbie ;
Sobol, Marion G. ;
Klein, Gary ;
Jiang, James J. .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (07) :657-664
[40]   Job characteristics, motivators and stress among information technology consultants: A structural equation modeling approach [J].
Wallgren, Lars Goran ;
Hanse, Jan Johansson .
INTERNATIONAL JOURNAL OF INDUSTRIAL ERGONOMICS, 2007, 37 (01) :51-59