Approximate cost estimating model of eco-type trade for river facility construction using case-based reasoning and genetic algorithms

被引:12
作者
Lee, Siwook [1 ]
Jin, Youngmin [1 ]
Woo, Sungkwon [1 ]
Shin, Do Hyoung [1 ]
机构
[1] Inha Univ, Dept Civil Engn, Inchon 402751, South Korea
关键词
approximate cost estimation; eco-type trade; eco-type river facility construction; case-based reasoning; genetic algorithms; DETERMINING ATTRIBUTE WEIGHTS; NEURAL-NETWORK;
D O I
10.1007/s12205-013-1638-5
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cost estimation in the construction industry is a critical process for the successful execution of construction. In particular, the total cost for a construction project is determined at the planning stage, and its estimation is very important because the decision making of the construction project owner regarding the project size, budget, and construction time depends on the total cost estimation. However, research concerned with the cost estimation for river facility construction has focused on research applicable in the early design stages rather than at the planning stage, which is the initial stage of a construction project. In addition, mainstream research has concentrated on the development of models centered on the estimation techniques being used currently in actual design engineering fields. For this reason, this study has developed an approximate construction cost estimating model for the eco-type river facility construction trade by applying Case-Based Reasoning (CBR) and Genetic Algorithms (GAs), which can be used at the planning stage. In order to develop the model, historical data was collected and analyzed; in order to overcome the limitations of the data collection, virtual data were also created and used. The model was developed in such a manner that it can estimate the construction cost with only eight and eleven attributes for the two eco-type trades used in the model, which can be applied at the planning stage. The results of the verification of the proposed model indicate that the model is satisfactory when applied in the approximate cost estimation of eco-type trade for river facility construction at the planning stage. It is expected that the proposed model will be applied easily and conveniently to the estimation of the approximate construction cost of eco-type trade for river facility construction at the planning stage.
引用
收藏
页码:292 / 300
页数:9
相关论文
共 25 条
[1]  
AAMODT A, 1994, AI COMMUN, V7, P39
[2]   Regularization neural network for construction cost estimation [J].
Adeli, H ;
Wu, MY .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1998, 124 (01) :18-24
[3]  
American Association of Cost Engineers (AACE), 1988, COST ENG NOT
[4]  
[Anonymous], 2002, Construction Management Economics
[5]  
CHOI I, 2009, KOREA I CONSTRUCTION, V10, P104
[6]   Using decision trees for determining attribute weights in a case-based model of early cost prediction [J].
Dogan, Sevgi Zeynep ;
Arditi, David ;
Guenaydin, H. Murat .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (02) :146-152
[7]   Determining attribute weights in a CBR model for early cost prediction of structural systems [J].
Dogan, Sevgi Zeynep ;
Arditi, David ;
Guenaydin, H. Murat .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (10) :1092-1098
[8]  
Eisma D., 2006, Dredging in coastal waters / [editor]
[9]  
Fortune C., 1996, RICS Research Paper Series, V2
[10]   Neural network model for parametric cost estimation of highway projects [J].
Hegazy, T ;
Ayed, A .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (03) :210-218