A multi-mode CCR model for entangled polymers with chain stretch

被引:39
|
作者
Ianniruberto, G [1 ]
Maitucci, G [1 ]
机构
[1] Univ Naples Federico II, Dept Chem Engn, I-80125 Naples, Italy
关键词
entangled polymers; chain stretch; CCR; multiple modes; power-laws;
D O I
10.1016/S0377-0257(01)00188-4
中图分类号
O3 [力学];
学科分类号
08 ; 0801 ;
摘要
The model recently proposed by the authors [J.Rheol.,45 (2001) 1305-1318] to account for convective constraint release (CCR) and chain stretch in entangled polymers is here extended to a multiple mode situation. Such an extension, indispensable for the polydisperse case, is believed to be important also for monodisperse polymers, especially in view of chain-end fluctuations. The model is compared with existing steady and transient start-up data of shear flows. It is also shown how the model can help explaining the frequently observed power-laws, especially for the case of melts. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:383 / 395
页数:13
相关论文
共 50 条
  • [41] A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem
    Elloumi, Sonda
    Fortemps, Philippe
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 205 (01) : 31 - 41
  • [42] MH-ARM: a Multi-mode and High-value Association Rule Mining Technique for Healthcare Data Analysis
    Yang, Libao
    Li, Zhe
    Luo, Guan
    2016 INTERNATIONAL CONFERENCE ON COMPUTATIONAL SCIENCE & COMPUTATIONAL INTELLIGENCE (CSCI), 2016, : 122 - 127
  • [43] A Dual-Population Memetic Algorithm for Minimizing Total Cost of Multi-Mode Resource-Constrained Project Scheduling
    Chen, Zhi-Jie
    Chyu, Chiuh-Cheng
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2010, 9 (02): : 70 - 79
  • [44] Hybridization of genetic algorithm and fully informed particle swarm for solving the multi-mode resource-constrained project scheduling problem
    Sebt, M. H.
    Afshar, M. R.
    Alipouri, Y.
    ENGINEERING OPTIMIZATION, 2017, 49 (03) : 513 - 530
  • [45] Nonlinear dynamics and conformational changes of linear entangled polymers using the Rolie-Poly model with an "effective" maximum contour length
    Kabanemi, Kalonji K.
    Hetu, Jean-Francois
    RHEOLOGICA ACTA, 2009, 48 (07) : 801 - 813
  • [46] Optimal Dynamic Resource Allocation for the Multi-mode Resource Constrained Project Scheduling via Non-Greedy Heuristic and Adaptive Metaheuristic
    Liu Xun
    Zhang Yi
    Li Hui-Ming
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE OF MANAGEMENT SCIENCE AND INFORMATION SYSTEM, VOLS 1-4, 2009, : 319 - 324
  • [47] Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm
    Ghoddousi, Parviz
    Eshtehardian, Ehsan
    Jooybanpour, Shirin
    Javanmardi, Ashtad
    AUTOMATION IN CONSTRUCTION, 2013, 30 : 216 - 227
  • [48] A Multi-Chain Slip-Spring Model without the Slip-Spring Degeneracy
    Masubuchi, Yuichi
    Doi, Yuya
    Ishida, Takato
    Uneyama, Takashi
    NIHON REOROJI GAKKAISHI, 2023, 51 (04) : 211 - 217
  • [49] A comparative study of modeling and solution approaches for the multi-mode resource-constrained discrete time-cost trade-off problem: Case study of an ERP implementation project
    Cakir, Gizem
    Subulan, Kemal
    Yildiz, Seyda Topaloglu
    Hamzadayi, Alper
    Asilkefeli, Ceren
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 169
  • [50] A Real-Time Unified Focusing Algorithm (RT-UFA) for Multi-Mode SAR via Azimuth Sub-Aperture Complex-Valued Image Combining and Scaling
    Sun, Guang-Cai
    Liu, Yanbin
    Xing, Mengdao
    Wang, Shiyu
    Yang, Jun
    Bao, Zheng
    Bao, Min
    IEEE TRANSACTIONS ON GEOSCIENCE AND REMOTE SENSING, 2022, 60