A multi-mode CCR model for entangled polymers with chain stretch

被引:39
|
作者
Ianniruberto, G [1 ]
Maitucci, G [1 ]
机构
[1] Univ Naples Federico II, Dept Chem Engn, I-80125 Naples, Italy
关键词
entangled polymers; chain stretch; CCR; multiple modes; power-laws;
D O I
10.1016/S0377-0257(01)00188-4
中图分类号
O3 [力学];
学科分类号
08 ; 0801 ;
摘要
The model recently proposed by the authors [J.Rheol.,45 (2001) 1305-1318] to account for convective constraint release (CCR) and chain stretch in entangled polymers is here extended to a multiple mode situation. Such an extension, indispensable for the polydisperse case, is believed to be important also for monodisperse polymers, especially in view of chain-end fluctuations. The model is compared with existing steady and transient start-up data of shear flows. It is also shown how the model can help explaining the frequently observed power-laws, especially for the case of melts. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:383 / 395
页数:13
相关论文
共 50 条
  • [21] Destabilizing effect of low frequency modes on process damped stability of multi-mode milling systems
    Tunc, Lutfi Taner
    Mohammadi, Yaser
    Budak, Erhan
    MECHANICAL SYSTEMS AND SIGNAL PROCESSING, 2018, 111 : 423 - 441
  • [22] Multi-mode optimal fuzzy active vibration control of composite beams laminated with photostrictive actuators
    Jia, Mancang
    Zheng, Shijie
    He, Rongbo
    CHINESE JOURNAL OF AERONAUTICS, 2019, 32 (06) : 1442 - 1450
  • [23] An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem
    Wang, Ling
    Fang, Chen
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (02) : 449 - 460
  • [24] Multi-mode optimal fuzzy active vibration control of composite beams laminated with photostrictive actuators
    Mancang JIA
    Shijie ZHENG
    Rongbo HE
    Chinese Journal of Aeronautics, 2019, 32 (06) : 1442 - 1450
  • [25] Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
    Sprecher, A
    Drexl, A
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 107 (02) : 431 - 450
  • [26] Multi-mode multi-skill resource-constrained project scheduling problem with differentiated pro- fessional capabilities
    Li, Chunhao
    Wang, Feng
    Chung, Tsuiping
    JOURNAL OF PROJECT MANAGEMENT, 2024, 9 (01) : 27 - 44
  • [27] Ant colony optimization-based multi-mode scheduling under renewable and nonrenewable resource constraints
    Li, Heng
    Zhang, Hong
    AUTOMATION IN CONSTRUCTION, 2013, 35 : 431 - 438
  • [28] Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting
    Cheng, Junzilan
    Fowler, John
    Kempf, Karl
    Mason, Scott
    COMPUTERS & OPERATIONS RESEARCH, 2015, 53 : 275 - 287
  • [29] Multi-mode vibration based electromagnetic type micro power generator for structural health monitoring of bridges
    Ahmad, Iftikhar
    Khan, Farid Ullah
    SENSORS AND ACTUATORS A-PHYSICAL, 2018, 275 : 154 - 161
  • [30] Multi-mode resource-constrained project scheduling using modified variable neighborhood search heuristic
    Chakrabortty, Ripon K.
    Abbasi, Alireza
    Ryan, Michael J.
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2020, 27 (01) : 138 - 167