Optimization for Process Routing in Steelmaking-Rolling Production

被引:0
作者
Zhang, Zhuohan [1 ]
Wang, Jie [1 ]
Chen, Tian [2 ]
Liu, Shixin [1 ]
机构
[1] Northeastern Univ, Coll Informat Sci & Engn, Shenyang 110819, Peoples R China
[2] Shanghai Baosight Software Co Ltd, MES Software Business Dept, Shanghai 201900, Peoples R China
来源
PROCEEDINGS OF THE 32ND 2020 CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2020) | 2020年
关键词
Steelmaking-rolling production process; Process Routing; Mathematical Model; Variable Neighborhood Search; Simulated Annealing; ALGORITHM;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Based on order information, process programming and production capacity constraints, a process routing optimization model for steelmaking-rolling production is established. In this model, we take into account the total amount of surplus materials, the total amount of cross logistics and the priority coefficient of the conversion of primary and secondary processes. A variable neighborhood simulated annealing algorithm is used to test the model and algorithm using actual data. The experimental results show that the model and algorithm proposed in this paper can give better process routing schemes and provide decision support for planners.
引用
收藏
页码:2554 / 2559
页数:6
相关论文
共 10 条
  • [1] Caporossi G, 2016, EUR J OPER RES, V24, P1097
  • [2] Iterated variable neighborhood descent algorithm for the capacitated vehicle routing problem
    Chen, Ping
    Huang, Hou-kuan
    Dong, Xing-Ye
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (02) : 1620 - 1627
  • [3] Multi-objective variable neighborhood search: an application to combinatorial optimization problems
    Duarte, Abraham
    Pantrigo, Juan J.
    Pardo, Eduardo G.
    Mladenovic, Nenad
    [J]. JOURNAL OF GLOBAL OPTIMIZATION, 2015, 63 (03) : 515 - 536
  • [4] Variable neighborhood search for location routing
    Jarboui, Bassem
    Derbel, Houda
    Hanafi, Said
    Mladenovic, Nenad
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (01) : 47 - 57
  • [5] Pang XF, 2017, CHIN CONT DECIS CONF, P4710, DOI 10.1109/CCDC.2017.7979329
  • [6] Improvement of constructive heuristics using variable neighbourhood descent for scheduling a flow shop with sequence dependent setup time
    Vanchipura, Rajesh
    Sridharan, R.
    Babu, A. Subash
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2014, 33 (01) : 65 - 75
  • [7] An improved cross entropy algorithm for steelmaking-continuous casting production scheduling with complicated technological routes
    Wang Gui-rong
    Li Qi-qiang
    Wang Lu-hao
    [J]. JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2015, 22 (08) : 2998 - 3007
  • [8] Wang XY, 2010, P AMER CONTR CONF, P6109
  • [9] A heuristic-based hybrid genetic-variable neighborhood search algorithm for task scheduling in heterogeneous multiprocessor system
    Wen, Yun
    Xu, Hua
    Yang, Jiadong
    [J]. INFORMATION SCIENCES, 2011, 181 (03) : 567 - 581
  • [10] Xue Yun-can, 2010, Control Theory & Applications, V27, P273